    Prarancangan Pabrik Pembuatan Soap Noodle dari RBDP-Stearin (Refined Bleached Deodorized Palm Stearin) Menggunakan Proses Saponifikasi dengan Kapasitas Produksi 46.000 Ton/Tahun

    The Preliminary Design of the Soap Noodle Plant from RBDP-Stearin (Refined Bleached Deodorized Palm Stearin) Using the Saponification Process with Production Capacity of 46,000 Ton/Year

    Thumbnail
    View/Open
    Cover (3.280Mb)
    Fulltext (5.320Mb)
    Date
    2024
    Author
    Baihaqi, Naufal
    Advisor(s)
    Sarah, Maya
    Bani, Okta
    Metadata
    Show full item record
    Abstract
    The preliminary design of the soap noodle plant from RBDP-Stearin using the saponification process has a production capacity of 46,000 tons/year and operates for 330 days a year. The main process in the preliminary design of this factory consist of four stages, namely the raw material preparation stage, the saponification and separation stage, the neutralization and mixing stage and the drying stage. The reaction is a saponification reaction that takes place in a continued stirred tank reactor (CSTR) which operated at a temperature of 120°C and a pressure of 2 bar with a residence time of 30 minutes. The factory for making soap noodle from RBDP-Stearin using the saponification process is planned to be established in the Sei Mangkei Special Economic Zone (KEK) area located in Simalungun Regency, North Sumatra with a total area of 14,751 m2. The workforce required is 194 people in the form of a Limited Liability Company or Perseroan Terbatas (PT) with a line and staff organizational structure. For the establishment and operation of the factory requires investment capital of IDR 357.032.538.292 and production costs of IDR 456.643.330.885. Based on the feasibility analysis, this plant has a BEP of 44,464%, ROI of 23,386%, POT for 4.28 years, RON of 38,976%, and IRR of 29,684%. From the results of the economic analysis. Based on the results of the economic analysis, it can be concluded that the preliminary design is feasible to be established.
    URI
    https://repositori.usu.ac.id/handle/123456789/100740
    Collections
    • Undergraduate Theses [1175]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV