Pra Rancangan Pabrik Biogas dari Limbah Sisa Makanan, Limbah Pabrik Tahu, dan Limbah Darah Rumah Potong Hewan dengan Proses Fermentasi Anaerobik Dua Tahap Kapasitas Bahan Baku 25.000 Ton/Tahun
dc.contributor.advisor | Hanum, Farida | |
dc.contributor.author | Lubis, Mhd Reza Kurniawan | |
dc.contributor.author | Simanjuntak, Handerson | |
dc.date.accessioned | 2025-02-10T07:32:45Z | |
dc.date.available | 2025-02-10T07:32:45Z | |
dc.date.issued | 2025 | |
dc.identifier.uri | https://repositori.usu.ac.id/handle/123456789/101039 | |
dc.description.abstract | Preliminary design of a biogas plant utilizing food waste, slaughterhouse blood waste, and tofu factory waste with a two-stage anaerobic fermentation process and a raw material capacity of 25,000 tonnes/year. This plant is designed to operate 330 days a year. The main process of this preliminary plant design, which uses a two-stage anaerobic fermentation process, consists of four stages: pretreatment, biogas formation, purification, and compression. The end product is methane with a purity of >98% at a pressure of 200 atm, resulting in bio-CNG with a production capacity of 3,267.63 tons/year and a bio-CNG volume of 7.57 m³/kg. The planned plant location is at the Maspion Industrial Estate, Gresik Regency, East Java, covering a total area of 15,246 m². Water requirements for this plant are supplied from the Kalimireng River, totaling 41,488,67 kg/h. The organizational structure of the planned company will be a Perseroan Terbatas (PT) with a line-and-staff organizational structure, employing a total of 125 people. Based on economic analysis, it is concluded that establishing the biogas plant from food waste, slaughterhouse blood waste, and tofu factory waste with a two-stage anaerobic fermentation process and a raw material capacity of 25,000 tonnes/year is feasible. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | anaerobic fermentation | en_US |
dc.subject | biogas | en_US |
dc.subject | methane | en_US |
dc.subject | bio-CNG | en_US |
dc.title | Pra Rancangan Pabrik Biogas dari Limbah Sisa Makanan, Limbah Pabrik Tahu, dan Limbah Darah Rumah Potong Hewan dengan Proses Fermentasi Anaerobik Dua Tahap Kapasitas Bahan Baku 25.000 Ton/Tahun | en_US |
dc.title.alternative | Preliminary Design of a Biogas Plant from Food Waste, Tofu Factory Waste, and Slaughterhouse Blood Waste Using A Two-Stage Anaerobic Fermentation Process with a Raw Material Capacity of 25,000 Tonnes/Year | en_US |
dc.type | Thesis | en_US |
dc.identifier.nim | NIM200405087 | |
dc.identifier.nim | NIM200405160 | |
dc.identifier.nidn | NIDN0010067805 | |
dc.identifier.kodeprodi | KODEPRODI24201#Teknik Kimia | |
dc.description.pages | 450 Pages | en_US |
dc.description.type | Skripsi Sarjana | en_US |
dc.subject.sdgs | SDGs 7. Affordable And Clean Energy | en_US |
Files in this item
This item appears in the following Collection(s)
-
Undergraduate Theses [1147]
Skripsi Sarjana