dc.description.abstract | Success is a goal that must be achieved in a project. However, construction
projects often face the challenge of delays in their implementation, which can
potentially cause losses to all parties involved. Time Cost Trade-Off is one of
the best ways to deal with delays, with the duration and cost optimized for the
project. This research focuses on optimizing time and costs in the 2nd Floor
Plate Construction Project of the Al Muwahhidin Mosque which has a hps cost
of Rp. 976,917,391 with a service usage fee of Rp. 205,000,000. This project
experienced a delay of 6.68% in the first week of implementation. The purpose
of this study is to determine the optimal time and cost before and after the
implementation of Time Cost Trade Off (TCTO) through alternative additions
to work duration (overtime) and the use of work shifts. This type of research is
a quantitative approach with case studies, and the data obtained includes cost
budget plans (rab), time schedules, unit price analysis, and project drawings.
The test results show that the acceleration of project duration with the use of
work shifts or shift time is better compared to the increase in work duration.
Duration optimization can be achieved within 46 calendar days, with an
additional cost of 0.0093% from the normal cost of Rp. 205,019,035.83. The
alternative in this study provides a solution to overcome the delays that occur
in the research project by considering optimal time and cost efficiency. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | Time Cost Trade Off (TCTO) | en_US |
dc.subject | Time and Cost Optimization | en_US |
dc.subject | Delays | en_US |
dc.subject | Acceleration of Project Duration | en_US |
dc.subject | Work Shifts | en_US |
dc.subject | Overtime Hours | en_US |
dc.title | Optimalisasi Waktu dan Biaya dengan Menggunakan Metode Time Cost Trade Off (Tcto) (Studi Kasus: Proyek Pembangunan Plat Lantai 2 Masjid Al Muwahhidin) | en_US |
dc.title.alternative | Optimizing Time and Costs Using the Time Cost Trade Off (TCTO) Method (Case Study: Al Muwahhidin Mosque 2nd Floor Construction Project) | en_US |
dc.type | Thesis | en_US |
dc.identifier.nim | NIM200404005 | |
dc.identifier.nidn | NIDN0031126118 | |
dc.identifier.kodeprodi | KODEPRODI22201#Teknik Sipil | |
dc.description.pages | 100 Pages | en_US |
dc.description.type | Skripsi Sarjana | en_US |
dc.subject.sdgs | SDGs 9. Industry Innovation And Infrastructure | en_US |