• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Pembuatan Propilen Glikol dari Propilen Oksida melalui Proses Hidrasi dan Distilasi Menggunakan Katalis Metil Format dengan Kapasitas 40.000 Ton/Tahun

    Preliminary Design Of A Propylene Glycol Production Plant From Propylene Oxide Through Hydration And Distillation Processes Using Methyl Formate Catalyst With A Capacity Of 40,000 Tons /Year

    Thumbnail
    View/Open
    Cover (3.665Mb)
    Fulltext (6.138Mb)
    Date
    2025
    Author
    Haq, Izharul
    Advisor(s)
    Masyithah, Zuhrina
    Metadata
    Show full item record
    Abstract
    The chemical industry in Indonesia is a vital sector that serves as an intermediary between upstream and downstream industries. One example of a product from the upstream industry is the chemical propylene glycol. The utilization of propylene glycol in industrial sectors is vast, particularly in the food, pharmaceutical, and cosmetic industries. Indonesia currently imports propylene glycol, but considering the projected imports in the coming years and the operational plants in several countries, a propylene glycol plant could be established in Indonesia, with operations commencing in 2032. The preliminary design of the propylene glycol production plant, utilizing the hydration method from propylene oxide, is planned to produce 40,000 tons per year and operate for 330 days annually. The production process will consist of five stages: raw material storage, raw material mixing, product formation reaction, methyl formate catalyst separation, and product purification. The proposed plant location is in Gerem Village, Grogol District, Cilegon Regency, Banten Province, covering an area of 11,492.4 m². The plant will require 165 employees, and the business entity will be a Limited Liability Company (PT) with a line-and-staff organizational structure. The economic evaluation shows an investment capital (CI) of IDR 106.400.064.084,79, total production costs of IDR 2.187.590.570.239, and sales of IDR 2.405.140.312.884, with a net profit of IDR 145.637.396.134,12. The profit margin is 9,05%, ROI is 23,19%, and IRR is 19.46%. The project is projected to break even (BEP) at 45,07% of the capacity, with an investment payback period (POT) of 4 years 4 months. Based on the economic analysis, the preliminary design of this plant is considered feasible for realization.
    URI
    https://repositori.usu.ac.id/handle/123456789/101431
    Collections
    • Undergraduate Theses [1175]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV