dc.description.abstractIn general, project schedules are typically created manually, which can lead to delays during implementation in the field. This is because uncertainties are not included in planning the project schedule. Delays in completing one task will result in the postponement of the next task. This research aims to reschedule to minimize delays in implementing the Savanna Sumatra Bridge Construction Project. This research uses the PERT Method & Monte Carlo Simulation in rescheduling, which involves using 3 time assumptions for each project work item: optimistic duration, most likely duration, and pessimistic duration. The research results using the PERT method obtained a project completion schedule of 162 working days with a 99.9% probability of project completion, 34 days faster than the project target duration of 196 working days. In the Monte Carlo Simulation with 3000 iterations using Oracle Crystal Ball software, the Mean project completion duration obtained was 162.77 days with a 50% probability and a Mean Std.Error of 0.11. To achieve a 99.9% probability in the Monte Carlo simulation with 3000 iterations, the project completion duration is 184 days, which is longer compared to the duration using the PERT method, which is greater than the duration using the PERT method, but still faster than the schedule plan of 196 days.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectDurationen_US
dc.subjectPERT Methoden_US
dc.subjectReschedulingen_US
dc.subjectMonte Carlo Simulationen_US
dc.titleAnalisis Penjadwalan Ulang Proyek Pembangunan Jembatan Savanna Sumatera dengan Menggunakan Metode Pert & Simulasi Monte Carloen_US
dc.title.alternativeRescheduling Analysis of the Savanna Sumatera Bridge Construction Project Using Pert Method & Monte Carlo Simulationen_US
dc.typeThesisen_US
dc.identifier.nimNIM217016024
dc.identifier.nidnNIDN0010108906
dc.identifier.nidnNIDN0005087605
dc.identifier.kodeprodiKODEPRODI22101#Teknik Sipil
dc.description.pages121 Pagesen_US
dc.description.typeTesis Magisteren_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record