• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Pembuatan Kaprolaktam dari Sikloheksanon Oksim dan Asam Sulfat melalui Proses Beckmann Rearrangement Menggunakan Kalsium Hidroksida sebagai Agen Netralisasi dengan Kapasitas 34.000 Ton/Tahun

    Preliminary Design of Caprolactam Manufacturing Plant from Cyclohexanone Oxime and Sulfuric Acid via Beckmann Rearrangement Process Using Calcium Hydroxide as Neutralization Agent with Capacity of 34,000 Tonnes/Year

    Thumbnail
    View/Open
    Cover (621.4Kb)
    Fulltext (4.235Mb)
    Date
    2025
    Author
    Siregar, Zahra Adelia
    Baroza, Anefa
    Advisor(s)
    Manurung, Renita
    Fath, Muhammad Thoriq Al
    Metadata
    Show full item record
    Abstract
    Preliminary design of caprolactam manufacturing plant from cyclohexanone oxime (C6H10(NOH)) and sulfuric acid (H2SO4) via beckmann rearrangement process is designed with a production capacity of 34,000 tons/year, operating for 330 days annually. The required quantities of cyclohexanone oxime and sulfuric acid are 4,665.423 kg/hour and 6,127.438 kg/hour, respectively. The production process comprises four primary stages, including raw material preparation, beckmann reaction formation, neutralization product, separation and purification. In the beckmann reaction formation stage, a beckmann reactor operates for 1 hour at 100°C. During the neutralization stage, a neutralization reactor maintains similar operational conditions until caprolactam is produced. The caprolactam production process utilizes 12,879.981 kg/hour of saturated steam and 89,226.951 kg/hour of cooling water. The electrical requirement is 495.42 hp, with diesel fuel consumption at 1,116.43 kg/hour. The factory is planned for Manyar Subdistrict, Gresik Regency, East Java Province, occupying a 17,600 m² area. The proposed business entity is a Limited Liability Company (PT) with a line and staff organizational structure, employing approximately 202 personnel. The economic aspect analysis results are as follows: The economic analysis of this plant design includes a Capital Investment (CI) of Rp 886,721,527,187, Total Cost of Rp 1,148,347,127,571, Profit Margin (PM) of 22.93%, Break Even Point (BEP) of 40.56%, Return on Investment (ROI) of 25.27%, Return on Network (RON) of 42.12%, Pay Out Time (POT) of 3 years 11 months, and an Internal Rate of Return (IRR) of 28.35%. Based on the economic analysis, the caprolactam production plant utilizing cyclohexanone oxime and sulfuric acid is deemed feasible for establishment.
    URI
    https://repositori.usu.ac.id/handle/123456789/101627
    Collections
    • Undergraduate Theses [1175]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV