• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Pembuatan Metil Salisilat dengan Proses Esterifikasi Metanol dan Asam Salisilat dengan Kapasitas 4.000 Ton/Tahun dan Tugas Khusus Rancangan Keteknikan Reaktor Alir Tangki Berpengaduk (RATB)

    Preliminary Plant Design of Methyl Salicylate from Methanol and Salicylic Acid Esterification with Production Capacity of 4000 Tons/Year and Spesific Assignment of Continous Stirred Tank Reactor (CSTR)

    Thumbnail
    View/Open
    Cover (1.456Mb)
    Fulltext (4.938Mb)
    Date
    2024
    Author
    Pane, Pebriansyah
    Advisor(s)
    Turmuzi, Muhammad
    Metadata
    Show full item record
    Abstract
    This methyl salicylate production plant from salicylic acid and methanol with esterification process has a production capacity of 4.000 tons/year and operates for 330 days a year. The main process in the pre-design of this factory consists of three stages, namely the raw material preparation stage, the esterification reaction process, the neutralization reaction process, and the methyl salicylate purification process. The reaction is an esterification reaction of salicylic acid and methanol with a sulfuric acid catalyst which takes place in a stirred tank flow reactor at a temperature of 68oC. The amount of acetaldehyde required to achieve annual production capacity is 1.125,562 kg/hour. The planned factory location is in Brongsong Village, Kendal Regency, Central Java Province. with a total plant area of 14.634 m2. Water needs in this factory are supplied from the Waridin River as much as 1.907,182 kg/hour. The required workforce is 114 people with the form of a Limited Company (Ltd) with a line and staff organizational structure. For the establishment and operation of the factory it requires capital investment of IDR 421.476.202.954 and production costst of IDR 104.478.602.951. Based on the feasiblity analysis, this plant has a BEP 30,11%, ROI 17,86% POT for 5,6 years, RON 29,78%, and IRR of 17,21%. Based on the economic analysis, it can be concluded that plant is feasible to established
    URI
    https://repositori.usu.ac.id/handle/123456789/101771
    Collections
    • Undergraduate Theses [1175]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV