dc.description.abstractTraffic made on Jalan Stasiun, Medan City, prompted the construction of an overpass as a solution. This construction project faces various risks that can affect time, cost and quality. This research aims to recognize potential risks, identify causes and impacts, and analyze significant risks using the Bow Tie Analysis method to manage project risks. This research uses the Bow Tie Analysis method to visualize the risk path from cause to impact. The main focus is on identifying hazards, threats, consequences, as well as controls that prevent and restore the impact of risks. The aim is to provide a comprehensive understanding of the relationship between risks and their causes and impacts for more effective risk management. After the risk analysis, it was concluded that there were 42 risk variables in the Medan City Station Road Overpass Construction project. The three dominant risks were lack of communication and coordination (R1), low awareness of OHS (R20), and project delay (R33). Three bow tie diagrams were created to identify the causes, impacts, and controls of these risks. Research suggestions include improving OHS communication and compliance through regular meetings and periodic OHS training. Time management needs to be structured in more detail with a project application for monitoring. Also, continuous monitoring and evaluation of risks is needed to ensure the effectiveness of controls and make adjustments if necessary.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectConstruction risken_US
dc.subjectRisk managementen_US
dc.subjectBow Tie Analysisen_US
dc.subjectRisk controlen_US
dc.subjectRisk identificationen_US
dc.titleAnalisis Manajemen Risiko pada Proyek Pembangunan Overpass Jl.Stasiun (Tahun Jamak) dengan Metode Bow Tie Analysisen_US
dc.title.alternativeRisk Management Analysis on Overpass Construction Project Jl. Stasiun (Multi-Year) With Bow Tie Analysis Methoden_US
dc.typeThesisen_US
dc.identifier.nimNIM200404123
dc.identifier.nidnNIDN0031126118
dc.identifier.kodeprodiKODEPRODI22201#Teknik Sipil
dc.description.pages111 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record