• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Pembuatan Kalsium Fluorida dari Amonium Fluorida dan Kalsium Hidroksida Melalui Proses Presipitasi Amonium Fluorida dan Kalsium Hidroksida dengan Kapasitas 150.000 Ton/Tahun

    Preliminary Plant Design of Calcium Fluoride from Ammonium Fluoride and Calcium Hydroxide Through Precipitation Process Using Ammonium Fluoride and Calcium Hydroxide with Production Capacity of 150,000 Tons/Year

    Thumbnail
    View/Open
    Cover (2.479Mb)
    Fulltext (3.687Mb)
    Date
    2025
    Author
    Sipayung, Manda Saur
    Advisor(s)
    Husin, Amir
    Metadata
    Show full item record
    Abstract
    The chemical industry in Indonesia is a very vital factor which can act as an intermediary between upstream and downstream industries. One example of results from upstream industry is calcium fluoride chemical products. The use of calcium fluoride in the industrial sector is very broad, namely in the glass, ceramics, steel, aluminum and cosmetics industrial sectors. Indonesia currently imports calcium fluoride, and taking into account the predicted imports for the next few years and factories in several countries that are already running, a calcium fluoride factory can be established in Indonesia and start operating in 2031. The pre-designed calcium fluoride manufacturing plant operates for 330 days a year. In designing a calcium fluoride manufacturing plant using ammonium fluoride and calcium hydroxide as raw materials through ammonium fluoride and calcium hydroxide precipitation processes with a capacity of 150,000 tons/year uses five stages, namely: raw material storage stage, raw material mixing stage, product formation reaction stage, filtrate and cake separation stage in centrifugation, printing stage and product drying. The planned factory location is a factory location in the Petis Sari Village area, Bunga District, Gresik Regency, East Java, Indonesia with a required land area of 33,942.9910 m2. The workforce required is 144 people with the factory business entity being a Limited Liability Company (PT) with a line and staff organizational structure. The economic evaluation shows that the total investment capital is IDR "748,080,085,982.21", Total Production Costs IDR. 1,531,539,715,385.17, Sales Proceeds Rp. 1,926,375,000,000.00, Net Profit Rp. 262,620,464,268.86, Profit Margin (PM) of 12.78%, Break Even Point (BEP) of 42,65%, Return on Investment (ROI) of 21,67%, Pay Out Time (POT) of 4,61 years ≈ 4 years, 6 months, Return on Network (RON) of 36,12%, Internal Rate of Return (IRR) of 22,80%. From the results of the economic aspect analysis, it can be concluded that this factory is feasible to establish. Key words: Ammonium Fluoride, Calcium Fluoride, Calcium Hydroxide, Precipitation.
    URI
    https://repositori.usu.ac.id/handle/123456789/102655
    Collections
    • Undergraduate Theses [1175]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV