Show simple item record

dc.contributor.advisorSyahrizal
dc.contributor.authorSinaga, Yogi Thenedy
dc.date.accessioned2025-04-14T03:05:47Z
dc.date.available2025-04-14T03:05:47Z
dc.date.issued2025
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/102923
dc.description.abstractA building is a structure that is built permanently and it’s function is to accommodate the human activities. Building construction begins with initiation stage, in the form of a conception stage based on owner’s projections of the building’s utilization. This conception stage requires a feasibility study to be used as a design development tool or as a cost control tool in the next stage. However, the budget projection in this initial estimate has many limits, one of which is the availability of very little project data, so that the prediction results are usually not very accurate. This study aims to create a model for estimating the total cost of the project (Y) based on the physical parameters of the building available at the initiation stage such as typical floor area (XI) and also the number of floors (X2). This study uses seven building project data that are normalized to the city of Medan and financial year (2024) by considering the construction cost index and the currency inflation rate. The result is a multiple linear regression model, and also a multiple quadratic non-linear regression model. Based on the results obtained through SPSS data analysis, it was found that the multiple linear regression model using two variables has better quality for predicting total costs, with the equation Y= -1,998,706,300 + 5,576,176.4 (X1) + 1,516,269,888 (X2) ± This equation has an R square value of 0.983 so that it can be stated as quite accurate, with a model error percentage of 11 % based on the MAPE value. This model can be used to predict buildings within the range of 1 to 3 floors, and the typical floor area of 167.7 to 1172.3 square meters.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectModel Estimasi Biaya Bangunan Gedungen_US
dc.subjectMetode Parametriken_US
dc.subjectEstimasi Biaya Konseptualen_US
dc.subjectCost Estimation Relations (CER’s)en_US
dc.titleModel Estimasi Biaya Konseptual Konstruksi Bangunan Gedung dengan Menggunakan Metode Parametrik (Studi Kasus: Bangunan di Kota Medan dan Sekitarnya)en_US
dc.title.alternativeConceptual Cost Estimation Model of Buiding Construction Using Parametric Method (Case Study: Buildings in Medan City and Sorrounding Areas)en_US
dc.typeThesisen_US
dc.identifier.nimNIM200404043
dc.identifier.nidnNIDN0031126118
dc.identifier.kodeprodiKODEPRODI22201#Teknik Sipil
dc.description.pages91 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 4. Quality Educationen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record