• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Pembuatan Isobutil Palmitat dengan Proses Esterifikasi Isobutil Alkohol dan Asam Palmitat Menggunakan Reaktor Reactive Distillation dengan Kapasitas Produksi 70.000 Ton/Tahun

    Preliminary Factory for Making Isobutyl Palmitate from Palmitic Acid and Isobutyl Alcohol by Esterification Process Using Reactor Reactive Distillation Has a Production Capacity of 70.000 Tonnes/Year

    Thumbnail
    View/Open
    Cover (1.402Mb)
    Fulltext (8.795Mb)
    Date
    2024
    Author
    Pratama, Muhammad Rizky
    Ihsan, Ahmad
    Advisor(s)
    Sukeksi, Lilis
    Metadata
    Show full item record
    Abstract
    The plant design for the manufacture of isobutyl palmitate from palmitic acid and isobutyl alcohol by esterification process has a production capacity of 70,000 tonnes/year and operates for 330 days a year. The main process in this plant design consists of two stages, namely the formation stage of isobutyl palmitate and the purification stage. In the formation stage of isobutyl palmitate, a reactive distillation reactor is used which operates at 117°C pressure 1 atm for 30.57 minutes requiring 7,265.350 kg/hour palmitic acid and 2,333.627 kg/hour isobutyl alcohol with 0.978 kg/hour sulfuric acid catalyst. In the esterification process, a reaction conversion of 99% was obtained. Then in the purification stage, several stages occur, namely the neutralisation stage of the catalyst, the decantation stage of the catalyst salt, and the evaporation stage. isobutyl palmitate produced has a purity of 99.8%. The plant location is planned in Sei Mangkei Special Economic Zone, Simalungun, North Sumatra with an area of 19.376,4 m2. The planned form of business entity is a Limited Liability Company (PT) with a total workforce of 166 people. For the establishment and operation of the plant requires investment capital of IDR 2.092.672.534.756 and production costs of IDR 1.615.807.603.314. Based on the feasibility analysis, this plant has a BEP of 26.35%, ROI of 20.29%, POT for 4,8 years, RON of 51.30%, and IRR of 33.251. From the results of economic analysis, it can be concluded that the pre-design of phosphoric acid production plant from phosphate rock and sulfuric acid by wet process is feasible.
    URI
    https://repositori.usu.ac.id/handle/123456789/103411
    Collections
    • Undergraduate Theses [1175]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV