• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Xylitol dari Tongkol Jagung Menggunakan Proses Hidrolisis dan Hidrogenasi dengan Kapasitas Produksi 1.250 Ton / Tahun

    Pre Design Manufacture of a Xylitol Production Plant from Corn Cobs Using Hydrolysis and Hydrogenation Processes with a Capacity of 1.250 Tons/Year

    Thumbnail
    View/Open
    Cover (807.4Kb)
    Fulltext (3.709Mb)
    Date
    2024
    Author
    Wardani, Retno Ari
    Siallagan, Cindy Claudia
    Advisor(s)
    Hasibuan, Rosdanelli
    Metadata
    Show full item record
    Abstract
    Xylitol is a natural sweetener that is often used as a sugar substitute because it has a low glycemic index and does not cause tooth decay. In addition to health benefits, xylitol is also increasingly in demand because it comes from natural sources. One of the potential raw materials for xylitol production is corn cobs. Corn cobs are agricultural waste that is abundant in Indonesia, but are often not optimally utilized. Utilization of corn cobs for xylitol production can be a solution to reduce waste and support more sustainable production. The factory is planned to be located in Belawan, Hamparan Perak District, Deli Serdang Regency, with a land area of 13,250.60 m2 and operates under a Limited Liability Company (PT). The management system applied is a chain of command and line of coordination structure. This factory will employ 171 people with a production capacity of 1,250 tons of xylitol per year, operating for 330 days per year. The results of the economic analysis show that fixed capital investment is Rp 63,797,055,297 and working capital investment is Rp 223,762,701,702.68 so that the total capital investment reaches Rp 287,559,756,999.68. The total production cost is estimated at Rp 81,044,280,202.19 with sales results of Rp 96,007,927,762.60 resulting in a net profit of Rp 59,590,895,393.41. The payback period of this factory is 4.8 years, the break-even point is 37.49%, the return on investment is 20.72%, the return on net assets is 37.67%, and the annual interest rate is 21.36%.
    URI
    https://repositori.usu.ac.id/handle/123456789/103762
    Collections
    • Undergraduate Theses [1175]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV