• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Pembuatan Bubuk Kaldu Jamur dari Jamur Kancing Menggunakan Metode Yap & Ng dengan Kapasitas 1.000 Ton/Tahun

    The Preliminary Design of a Mushroom Broth Powder Factory from Button Mushrooms Using the Yap & Ng Method with a Capacity Of 1,000 Tons/Year

    Thumbnail
    View/Open
    Cover (1.039Mb)
    Fulltext (6.233Mb)
    Date
    2025
    Author
    Ambarita, Renata
    Sinamo, Gloria Clarita
    Advisor(s)
    Irvan
    Sidabutar, Rivaldi
    Metadata
    Show full item record
    Abstract
    The increasing need for food additives (BTP) increases along with technological advances to support an increasingly fast way of life. An alternative to the fulfillment of BTP using natural ingredients is the manufacture of mushroom broth powder from button mushrooms using the Yap & Ng method with a production capacity of 1,000 tons / year and operating for 330 days a year. The main processes in this pre- designed plant are raw material preparation, pre-treatment of main ingredients, complementary ingredients, and thickeners, extraction process, mixing of raw materials, product formation. The mushroom broth powder manufacturing plant is planned to be established in the Lumbangsari area, Bululawang District, Malang Regency, East Java with a land area of 19,250 m2, the required workforce is 107 people with a limited liability company (PT) business form led by a director with a line and staff organization system. For the establishment and operation requires investment capital of Rp. 298,580,294,924.56 and production costs of Rp. 235,576,282,554.14. Based on the feasibility analysis, this plant has a Profit Margin of 23.38%, BEP of 56.096%, ROI of 17.236%, POT for 5 years and 8 months, RON of 28.728%, and IRR of 16%. From the economic analysis, it can be concluded that the pre-designed plant for making mushroom stock powder from button mushrooms using the Yap & Ng method is feasible.
    URI
    https://repositori.usu.ac.id/handle/123456789/103794
    Collections
    • Undergraduate Theses [1175]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV