• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Usulan Perencanaan Perawatan Mesin Chopper Menggunakan Metode Failure Mode Effect Criticality Analysis (FMECA) dan Reliability Centered Maintenance (RCM) pada PT. XYZ

    Chopper Machine Maintenance Planning Proposal Using Failure Mode Effect Criticality Analysis (FMECA) Method and Reliability Centered Maintenance at PT. XYZ

    Thumbnail
    View/Open
    Cover (520.4Kb)
    Fulltext (1.945Mb)
    Date
    2025
    Author
    Lubis, Juni Arta
    Advisor(s)
    Erwin
    Metadata
    Show full item record
    Abstract
    PT. XYZ is a manufacturing company that produces tapioca flour. The problem occurring at PT. XYZ is caused by the implementation of an unscheduled maintenance system. This condition results in disruptions to the production process if damage occurs and causes losses due to production stoppages. This research aims to identify the distribution of damage patterns on critical components of the chopper machine, so that the appropriate damage and repair intervals can be determined. Thus, the company can develop a preventive maintenance schedule and determine the estimated cost of machine repairs. Therefore, improvements in machine maintenance planning and cost calculation are necessary using the Failure Mode Effect and Criticality Analysis and Reliability Centered Maintenance methods. The results of this study indicate that the critical components causing the chopper machine to malfunction are the cutting blades and bearings, with a total of five malfunctions occurring between February 2024 and February 2025. The proposed preventive maintenance includes a schedule for the restoration task of dull cutting blades with a maintenance interval of every 57 days and a schedule for the discard task of cutting blades with a replacement interval of every 70 days. Next, a schedule for the restoration task of worn bearings with a maintenance interval of every 52 days and a schedule for the discard task of bearings with a replacement interval of every 83 days. Based on the cost calculation results, the cost of machine maintenance failure is Rp 3.700.103.438, while the cost of preventive machine maintenance is Rp 2.591.555.415. This shows that the company can save Rp 1.108.548.023 by performing preventive machine maintenance.
    URI
    https://repositori.usu.ac.id/handle/123456789/104892
    Collections
    • Undergraduate Theses [1574]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    • Perpustakaan
    • Resouce Guide
    • Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    • Perpustakaan
    • Resouce Guide
    • Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV