• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Evaluasi Penerapan Manajemen Waktu pada Proyek Pembangunan IPA Brayan Kapasitas 500 Liter/Detik

    Evaluation of Time Management Implementation in the Construction Project of the Brayan water Treatment Plant with a Capacity of 500 Liters/Second

    Thumbnail
    View/Open
    Cover (996.4Kb)
    Fulltext (4.757Mb)
    Date
    2025
    Author
    Maharani, Putri Sheila
    Advisor(s)
    Rambe, Andy Putra
    Metadata
    Show full item record
    Abstract
    The development of water management infrastructure plays a crucial role in ensuring the availability of clean water and supporting community well-being. One such effort is the construction of the Brayan Water Treatment Plant (IPA) in Medan City, designed to process 500 liters of water per second from the Deli River. However, the implementation encountered delays in several key production units, including the flocculation/coagulation tank, sedimentation tank, and filtration tank. This study aims to evaluate the implementation of time management in the project based on the Project Management Body of Knowledge (PMBOK) Fifth Edition. The research method involved the distribution of questionnaires using a Likert scale and interviews with project personnel. The analysis results indicate that the level of time management implementation reached 80.62%, categorized as “adequate.” Several dominant factors influencing the effectiveness of time management include schedule alignment with project needs, team understanding of assigned tasks, flexibility in activity sequencing, and accuracy in resource estimation. These findings are expected to serve as a foundation for more strategic and structured time management practices in future infrastructure projects.
    URI
    https://repositori.usu.ac.id/handle/123456789/105022
    Collections
    • Undergraduate Theses [1543]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV