• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perancangan Ulang Tata Letak Fasilitas dengan Metode Systematic Layout Planning dan Algoritma CORELAP

    Redesign of Facility Layout Using Systematic Layout Planning Method and CORELAP Algorithm

    Thumbnail
    View/Open
    Cover (1.472Mb)
    Fulltext (6.698Mb)
    Date
    2025
    Author
    Sitohang, Diana Carolina
    Advisor(s)
    Siregar, Ikhsan
    Metadata
    Show full item record
    Abstract
    UD. Frans Mora Jaya Perabot is experiencing inefficiencies in its production facility layout, resulting in suboptimal material flow, backtracking, cross movements, by-passing, and excessive material travel distances. These issues have contributed to the production target being met only at 90,67% of the intended 100%. This study aims to redesign the facility layout to improve material flow efficiency and reduce material handling costs by applying the Systematic Layout Planning (SLP) method and the CORELAP algorithm. SLP is used to systematically analyze the proximity relationships between workstations based on material flow data and activity relationships, while the CORELAP algorithm is employed to arrange the layout based on the Total Closeness Rating (TCR) of each workstation. The analysis results show that the proposed layout using SLP improves the Line Efficiency Rate (LER) from 64,46% to 83,23%, reduces the total material movement distance from 9.034,23 m/month to 8.395,27 m/month (a decrease of 7,07%), and lowers material handling costs from IDR 7,500,000/month to IDR 6.969.551/month (a decrease of 7,07%). Based on these findings, it can be concluded that the application of SLP and CORELAP effectively addresses the layout inefficiencies. However, the selection of the optimal method must also consider physical implementation constraints in the field. Therefore, it is recommended that management ensure facility and resource readiness before fully implementing the proposed layout.
    URI
    https://repositori.usu.ac.id/handle/123456789/105352
    Collections
    • Undergraduate Theses [1567]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV