• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perbandingan Quantity Take Off Menggunakan Metode Building Information Modelling (BIM) dengan Software Archicad 28

    Comparison of Quantity Take Off Using The Building Information Modelling (BIM) Method with Archicad 28 Software

    Thumbnail
    View/Open
    Cover (1.776Mb)
    Fulltext (3.109Mb)
    Date
    2025
    Author
    Hrp, Nadyya Nurul Septiana
    Advisor(s)
    Syahrizal
    Metadata
    Show full item record
    Abstract
    Modern construction projects face increasing complexity, highlighting issues of inefficiency and potential inaccuracy in material quantity calculations using conventional methods. This research aims to compare the efficiency and accuracy of Quantity Take Off (QTO) between the Building Information Modelling (BIM) method using Archicad 28 software and conventional methods. Utilizing a hypothetical project as a case study, this research adopts a comparative quantitative approach. Quantity data for structural (coloumn, beam, and slab) were calculated both manually and automatically using Archicad 28. The results indicate that using Archicad 28 for the QTO process significantly improves speed and accuracy compared to conventional methods, reducing the potential for human error and providing more consistent data. Nevertheless, initial BIM adoption requires an investment of time and resources for training and adaptation. These findings suggest that BIM with Archicad 28 is a superior solution for project quantity management. For future research, it is recommended to expand the case study to larger-scale real projects, consider factors such as interoperability between BIM software, and analyze the overall impact of BIM on project management, including cost and time aspects in greater depth.
    URI
    https://repositori.usu.ac.id/handle/123456789/105396
    Collections
    • Undergraduate Theses [1543]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV