• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perkiraan Biaya Konstruksi Bangunan Gedung dengan Metode Cost Significant Model (Studi Kasus: Bangunan di Kota Pematangsiantar)

    Estimating the Construction Cost of Building with the Cost Significant Model (Case Study: Buildings in Pematangsiantar City)

    Thumbnail
    View/Open
    Cover (1.410Mb)
    Fulltext (8.399Mb)
    Date
    2025
    Author
    Sinaga, Blessta Elisa
    Advisor(s)
    Syahrizal
    Metadata
    Show full item record
    Abstract
    One of the major challenges in the construction industry is cost estimation. Inaccuracies in the planning stage can lead to operational constraints, financial losses, and even the risk of project termination. Limited time and information availability in the early stages of planning mean that cost estimation cannot be done based on detailed work volume calculations, given that the details and specifications of the work have not been compiled completely. Therefore, an estimation model is needed that is able to provide accurate results based on minimal information. This research uses the Cost Significant Model (CSM) method, which is a cost estimation approach based on historical project data with a focus on the most significant cost components that affect total costs, and analyzed using multiple linear regression. The purpose of this research is to develop a cost estimation model for building construction in Pematangsiantar City. The data used comes from seven similar project packages in the 2018-2024 period. The analysis shows that there are four types of significant work (Cost Significant Items) with a cumulative contribution of 87.65%, namely: Reinforced Concrete (X3), Wall (X4), Roof and Ceiling (X6), and Floor (X5). The estimation model obtained is the equation Y = -1180589.554 + 1.144X3 + 3.347X4 + 0.955X6 + 0.871X5 with a Cost Model Factor of 0.9998. The accuracy of the model is in the range of -0.64% to 0.42% with an average of +0%. The value falls into Class 1 of the AACE International classification which has a lower limit of -3% to -10% and an upper limit of +3% to 15%. The estimation model is feasible to use for bid estimate checking.
    URI
    https://repositori.usu.ac.id/handle/123456789/105423
    Collections
    • Undergraduate Theses [1543]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV