Show simple item record

dc.contributor.advisorErwin
dc.contributor.authorNingsih, Ranti Widya
dc.date.accessioned2025-07-15T03:19:16Z
dc.date.available2025-07-15T03:19:16Z
dc.date.issued2025
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/105429
dc.description.abstractUMKM As-Li Khas Medan is a microenterprise established in 2012, engaged in the food processing sector, particularly in the production of traditional cookies such as pineapple tarts, skippy cookies, and snow cookies in Medan, North Sumatra. The main problem faced by the enterprise is the presence of waste, such as overprocessing and excessive waiting time during production activities, which may result in the inability to meet market demand. The objective of this study is to eliminate waste and non-value-added activities in the production process by applying Lean Manufacturing and Value Stream Mapping methods, as well as to provide improvement suggestions using the Failure Mode Effect and Critical Analysis (FMECA) method. Based on observations and measurements at UMKM As-Li Khas Medan, there were 28 activities identified, with a total non-value-added time of 74.37 minutes, a manufacturing lead time of 521,08 minutes, a process cycle efficiency (PCE) of 80,89%, and a process velocity of 0,05373 process/hour, After eliminating three non-value-added activities, improvements were achieved by reducing the number of activities to 25, decreasing the non-value-added time to 0,00 minutes, reducing the manufacturing lead time to 446,71 minutes, increasing the process cycle efficiency to 94,36%, and process velocity increased to 0,05596 process/hour, As a result of these improvements, the monthly production output increased from 369,500 units/month to 421,914 units/month, Based on the Failure Mode Effect and Critical Analysis, the criticality level of the overprocessing and waiting waste was classified as unacceptable with a score of 320, 240 and 192, Proposed improvements include: establishing standard operating procedures (SOPs) for production activities, maximizing the capacity of the production area or adding new machines/equipment to ensure smoother production flow, and conducting regular supervision for all workers.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectLean Manufacturingen_US
dc.subjectValue Stream Mappingen_US
dc.subjectProcess Cycle Efficiencyen_US
dc.subjectManufacturing Lead Timeen_US
dc.subjectFailure Mode Effect Critical Analysisen_US
dc.titleReduksi Kegiatan Non Value Added dengan Pendekatan Lean Manufacturing Menggunakan Metode Value Stream Mapping (VSM)en_US
dc.title.alternativeReduction of Non Value Added Activities with The Lean Manufacturing Approach using The Value Stream Mapping (VSM) Methoden_US
dc.typeThesisen_US
dc.identifier.nimNIM210403018
dc.identifier.nidnNIDN0006097209
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages163 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record