    Usulan Perancangan Ulang Tata Letak Fasilitas Menggunakan Metode Algoritma Artificial Bee Colony pada Harisma Teknik

    Redesign of Facility Layout Using the Artificial Bee Colony Algorithm Method at Harisma Teknik

    Thumbnail
    View/Open
    Cover (962.8Kb)
    Fulltext (3.907Mb)
    Date
    2025
    Author
    Siregar, Gresindah
    Advisor(s)
    Tarigan, Indah Rizkya
    Metadata
    Show full item record
    Abstract
    Harisma Teknik is a manufacturing company that produces machine parts, including gears, sand pump fans and Grinding Machine Axles. This company has a problem, namely there is a time difference, where the target time for the sand pump fan product is smaller than its cycle time. This condition occurs because the material transfer is carried out manually without the help of a helper which causes a large transfer time. The large transfer time is the result of a less efficient production line because there is backtracking and by-passing which extends the distance of the line. This problem can be solved by using improvements to the production floor layout using the Artificial Bee Colony (ABC) Algorithm. The working principle of ABC is to imitate the behavior of honey bees in finding and optimizing food sources (the best solution). This study aims to design a production floor layout that can minimize distance, total displacement moment, and material handling costs, and cycle time. The results of this study indicate a decrease in the total displacement distance on the production floor from 303.32 meters to 211.30 meters. The total displacement moment on the production floor also decreased from 52,748.08 meters/month to 36,742.00 meters/month. Material Handling Costs on the production floor also decreased from Rp 9,000,404.89 / month to Rp 6,269,287.46 / month. LER on the proposed floor also increased from 59% to 89%. Cycle time on gear production from 3,822.44 seconds to 3,757.20 seconds, on sand pump fan production from 3,639.60 seconds to 3,793.20 and on grinding machine axle products from 4,089.60 seconds to 4,234.40 seconds. The cycle time on the three products is smaller than the target production time. In the production flow there is also no more backtracking and by-passing only occurs in one transfer.
    URI
    https://repositori.usu.ac.id/handle/123456789/105433
    Collections
    • Undergraduate Theses [1565]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV