Analisis Pengukuran Efektivitas Mesin pada Mesin Screw Press di PT. XYZ dengan Metode Overall Equipment Effectiveness (OEE) dan Overall Resource Effectiveness (ORE)
Analysis of Machine Effectiveness Measurement on the Screw Press Machine at PT. XYZ Using the Overall Equipment Effectiveness (OEE) and Overall Resource Effectiveness (ORE) Methods

Date
2025Author
Siagian, Michael Aaron Jeremy Mardika
Advisor(s)
Panjaitan, Nismah
Metadata
Show full item recordAbstract
PT. XYZ is a company engaged in the production of Crude Palm Oil (CPO). In its operations, the company utilizes various types of machinery, one of which is the screw press machine. Based on maintenance data from April 2024 to March 2025, the screw press machine recorded the highest breakdown time compared to other machines. This machine operates with two units simultaneously without any backup unit. Due to continuous use, the screw press machine experiences frequent breakdowns and a decline in effectiveness. This study was conducted to identify the causes of low effectiveness. The methods used include Overall Equipment Effectiveness (OEE), Overall Resource Effectiveness (ORE), Six Big Losses, fishbone diagram, Failure Mode and Effect Analysis (FMEA), Cognitive Reliability and Error Analysis Method (CREAM), Mean Time Between Failure (MTBF), and Mean Time To Repair (MTTR). The results showed that the OEE values for screw press machines I and II were 52.21% and 53.19%, respectively. The ORE values for screw press machines I and II were 36.74% and 37.44%, respectively. According to the Pareto diagram of the Six Big Losses, the primary causes of low effectiveness were Equipment Failure and Reduced Speed. FMEA identified the highest Risk Priority Number (RPN) as the lack of operator focus with a value of 168 for Equipment Failure, and improper maintenance scheduling with a value of 196 for Reduced Speed. CREAM analysis identified ensuring visual inspection of press cake conditions—whether oily or high broken nut content—as the most high-risk activity,
with an adjusted CFP of 2.437. The planned maintenance schedule is once every two days.
Collections
- Undergraduate Theses [1562]
Related items
Showing items related by title, author, creator and subject.
-
Usulan Perbaikan Efektivitas Mesin Roll Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Failure Mode and Effect Analysis (FMEA) di CV. Nina Bakery
Handani, Fiqri (Universitas Sumatera Utara, 2023)CV. Nina Bakery is a business engaged in bread production. The problem faced by the factory is that there is a large amount of damage to the Roll machine, resulting in less than optimal output. The purpose of this study ... -
Usulan Perbaikan Efektivitas Mesin Filter Press Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Failure Mode and Effect Analysis (FMEA) di PT. Aroma Mega Sari
Sembiring, Sella (Universitas Sumatera Utara, 2024)PT. Aroma Mega Sari is a company engaged in the production of rice flour. The issue faced by the factory is the significant amount of damage to the Filter Press machine, resulting in suboptimal output. The aim of this ... -
Analisis Efektivitas Mixer Spiral Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Failure Mode and Effect Analysis (FMEA) di PT. Sehati Tortilla
Ardianti, Nila (Universitas Sumatera Utara, 2024)PT. Sehati Tortilla is a business engaged in the production of tortillas (kebab wraps). The production capacity of this company allows it to produce 1,500 packs of tortillas every day, hence the company requires machinery ...