Show simple item record

dc.contributor.advisorPanjaitan, Nismah
dc.contributor.authorSiagian, Michael Aaron Jeremy Mardika
dc.date.accessioned2025-07-16T03:16:47Z
dc.date.available2025-07-16T03:16:47Z
dc.date.issued2025
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/105544
dc.description.abstractPT. XYZ is a company engaged in the production of Crude Palm Oil (CPO). In its operations, the company utilizes various types of machinery, one of which is the screw press machine. Based on maintenance data from April 2024 to March 2025, the screw press machine recorded the highest breakdown time compared to other machines. This machine operates with two units simultaneously without any backup unit. Due to continuous use, the screw press machine experiences frequent breakdowns and a decline in effectiveness. This study was conducted to identify the causes of low effectiveness. The methods used include Overall Equipment Effectiveness (OEE), Overall Resource Effectiveness (ORE), Six Big Losses, fishbone diagram, Failure Mode and Effect Analysis (FMEA), Cognitive Reliability and Error Analysis Method (CREAM), Mean Time Between Failure (MTBF), and Mean Time To Repair (MTTR). The results showed that the OEE values for screw press machines I and II were 52.21% and 53.19%, respectively. The ORE values for screw press machines I and II were 36.74% and 37.44%, respectively. According to the Pareto diagram of the Six Big Losses, the primary causes of low effectiveness were Equipment Failure and Reduced Speed. FMEA identified the highest Risk Priority Number (RPN) as the lack of operator focus with a value of 168 for Equipment Failure, and improper maintenance scheduling with a value of 196 for Reduced Speed. CREAM analysis identified ensuring visual inspection of press cake conditions—whether oily or high broken nut content—as the most high-risk activity, with an adjusted CFP of 2.437. The planned maintenance schedule is once every two days.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectMaintenanceen_US
dc.subjectOverall Equipment Effectivenessen_US
dc.subjectOverall Resource Effectivenessen_US
dc.subjectSix Big Lossesen_US
dc.subjectFailure Mode Effect and Analysis (FMEA)en_US
dc.subjectCognitive Reliability and Error Analysis Method (CREAM)en_US
dc.subjectMean Time Between Failure (MTBF)en_US
dc.subjectMean Time to Repair (MTTR)en_US
dc.titleAnalisis Pengukuran Efektivitas Mesin pada Mesin Screw Press di PT. XYZ dengan Metode Overall Equipment Effectiveness (OEE) dan Overall Resource Effectiveness (ORE)en_US
dc.title.alternativeAnalysis of Machine Effectiveness Measurement on the Screw Press Machine at PT. XYZ Using the Overall Equipment Effectiveness (OEE) and Overall Resource Effectiveness (ORE) Methodsen_US
dc.typeThesisen_US
dc.identifier.nimNIM210403093
dc.identifier.nidnNIDN0112018003
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages91 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 4. Quality Educationen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record