• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Usulan Perancangan Tata Letak Fasilitas Lantai Produksi Berbasis Lean Manufacturing pada CV. Raja Aluminium Menggunakan Value Stream Mapping dan Modified Squirrel Search Algorithm

    Layout Design Proposal Production Floor Facilities Based Lean Manufacturing at CV. Raja Aluminum Uses Value Stream Mapping and Modified Squirrel Search Algorithm

    Thumbnail
    View/Open
    Cover (3.007Mb)
    Fulltext (4.810Mb)
    Date
    2025
    Author
    Sitanggang, Hotden
    Advisor(s)
    Ukurta
    Metadata
    Show full item record
    Abstract
    CV. Raja Aluminium is a manufacturing company engaged in the production of household equipment made from aluminum, such as display cases, showcases, and dish racks. Based on the results of observations, several problems were identified, including inefficient production flow, the occurrence of non-value added activities, as well as backtracking, by-passing, and cross movement between workstations, which increase the material handling distance. Therefore, this study aims to propose a redesign of the production floor layout to achieve a more efficient facility layout using the lean manufacturing approach. The Value Stream Mapping (VSM) method is used to map the production flow and identify six non-value added activities through Process Activity Mapping (PAM), which are then eliminated using the 5W + 1H method. Furthermore, to generate the best layout alternative capable of minimizing material handling distance, the Modified Squirrel Search Algorithm (MSSA) is applied as the optimization method. The implementation of MSSA shows an improvement in the initial layout’s line efficiency rate from 52,15% to 83,70%. The results of this study indicate that the application of a lean manufacturing-based layout with the combination of VSM and MSSA can reduce non-value added activities, decrease the initial lead time from 299,10 minutes to 215,47 minutes after improvements, and optimize material flow. Thus, the proposed facility layout can improve the efficiency of the production process at CV. Raja Aluminium.
    URI
    https://repositori.usu.ac.id/handle/123456789/105712
    Collections
    • Undergraduate Theses [1562]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV