Show simple item record

dc.contributor.advisorGinting, Rosnani
dc.contributor.authorPutra, Audityo Mikha Ananda
dc.date.accessioned2025-07-19T09:09:40Z
dc.date.available2025-07-19T09:09:40Z
dc.date.issued2025
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/105826
dc.description.abstractCV Karangsari Furniture is a private company dedicated to the production of various types of furniture, with its flagship product being two-door wardrobes. Observations on the production floor have identified a bottleneck at the gluing workstation, evidenced by the accumulation of semi-finished goods and disparities in cycle times across workstations. This issue arises due to the complexity of the production process, compounded by the disproportionate distribution of workload among workstations. This study aims to enhance the balance of the production line by employing the Ranked Positional Weight (RPW) and Integer Programming (IP) methods. Data collection was conducted through direct and repeated measurements of the time required for each work element. The results of the data adequacy and uniformity tests indicate that the operational time data meet the criteria for sufficiency and uniformity, making them suitable for further analysis. The application of the RPW method resulted in a production line configuration consisting of five workstations: measurement and cutting, gluing, assembly, accessory installation, and finishing. Meanwhile, the implementation of the Integer Programming method, with the objective function “min cycle time”, and constraints related to cycle time, resources, and inter-process relationships, yielded a configuration of four workstations by merging the assembly and accessory installation workstations. A comparison of the two methods demonstrates that Integer Programming significantly reduces the number of workstations and enhances production line efficiency while adhering to precedence and zoning constraints. The implementation of this solution is expected to address the accumulation of semi-finished goods and reduce idle time in the production of twodoor wardrobes at CV Karangsari Furniture.en_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectInteger Programmingen_US
dc.subjectCabineten_US
dc.subjectLine Balancingen_US
dc.subjectRanked Positional Weighten_US
dc.subjectCycle Timeen_US
dc.titleOptimasi Keseimbangan Lintasan Produksi dengan Pendekatan Ranked Positional Weight (RPW) dan Integer Programming (IP) pada Karangsari Furnitureen_US
dc.title.alternativeOptimization of Production Line Balancing Through Ranked Positional Weight (RPW) and Integer Programming (IP) Methods at Karangsari Furnitureen_US
dc.typeThesisen_US
dc.identifier.nimNIM210403004
dc.identifier.nidnNIDN0021026303
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages176 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record