Show simple item record

dc.contributor.advisorGinting, Rosnani
dc.contributor.authorLiong, Nicholas
dc.date.accessioned2025-07-21T06:02:52Z
dc.date.available2025-07-21T06:02:52Z
dc.date.issued2025
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/105983
dc.description.abstractThe furniture industry faces challenges in meeting high market demand, primarily due to suboptimal production scheduling. This research aims to optimize wardrobe production scheduling at Karangsari Furniture to minimize makespan (total completion time) using the Dynamic Programming (DP) method. The company's current method, Campbell Dudek Smith (CDS), is compared with the proposed dynamic programming approach to evaluate efficiency. Data was collected through direct observation and document studies, encompassing process times, rating factors, allowances, and product demand. Time measurements were validated through tests for data uniformity and sufficiency. Analysis results show the actual makespan was 190.929 hours with the sequence Job A-B-C, whereas dynamic programming yielded a makespan of 169.576 hours with the optimal sequence Job B-C-A. An Efficiency Index (EI) value of 1.139 proves the superiority of dynamic programming compared to CDS. The conclusion of this research affirms that dynamic programming is effective in reducing makespan and production delays. Implementing dynamic programming can enhance production floor efficiency and customer satisfaction. Recommendations for the company include adopting dynamic programming for routine scheduling and exploring other methods for further development. This research contributes to the operational literature of the furniture industry with a dynamic programming-based optimization approach.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectDynamic Programmingen_US
dc.subjectFurniture Industryen_US
dc.subjectMakespanen_US
dc.subjectOptimizationen_US
dc.subjectProduction Schedulingen_US
dc.titleOptimasi Penjadwalan Mesin Seri untuk Meminimalkan Makespan Menggunakan Metode Dynamic Programmingen_US
dc.title.alternativeOptimization of Series Machine Scheduling to Minimize Makespan Using Dynamic Programming Methoden_US
dc.typeThesisen_US
dc.identifier.nimNIM210403048
dc.identifier.nidnNIDN0021026303
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages123 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record