• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Smelter Grade Alumina Refinery Dengan Bahan Baku Bauksit Dan Natrium Hidroksida Melalui Proses Bayer Dengan Kapasitas 1.000.000 Ton/Tahun

    The Preliminary Plant of Smelter Grade Alumina Refinery With Bauxite and Sodium Hidroxide as a Raw Material Through Bayer Process with Capacity 1.000.000 Ton/ Year

    Thumbnail
    View/Open
    Cover (18.65Mb)
    Fulltext (43.88Mb)
    Date
    2025
    Author
    Harahap, Muhammad Naufal Fikry
    Dharmawan, Muhammad Farhan
    Advisor(s)
    Halimatuddahliana
    Metadata
    Show full item record
    Abstract
    Indonesia is one of the countries with the largest bauxite reserves in the world, yet most of it is still exported in raw form. To support the government's downstream mineral program and reduce dependency on imported alumina, a preliminary design study of a Smelter Grade Alumina (SGA) plant using the Bayer process was conducted. This study aims to produce high-quality alumina from local bauxite ore and evaluate the technical and economic feasibility of the plant establishment. The plant is designed with a production capacity of 1,000,000 tons per year, using bauxite and sodium hydroxide (NaOH) as the main raw materials. The production process includes four main stages: grinding, digestion, precipitation, and calcination. The final product is alumina (Al₂O₃) with a purity of 98.98%. Economic analysis results show that the total investment required is IDR 5,243,941,979,617, with an estimated annual net profit after tax of IDR 1,112,021,550,997. The Break Even Point (BEP) is achieved at 30.55% production capacity, the Return on Investment (ROI) is 20.94%, the Internal Rate of Return (IRR) is 22.49%, and the Pay Out Time (POT) is 11 years and 4 months. Based on these indicators, the project is declared technically and economically feasible and has strategic potential to support national downstream initiatives and job creation
    URI
    https://repositori.usu.ac.id/handle/123456789/106127
    Collections
    • Undergraduate Theses [1201]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV