Show simple item record

dc.contributor.advisorTarigan, Ukurta
dc.contributor.authorSipayung, Deardo Mario Johanes
dc.date.accessioned2025-07-23T06:38:32Z
dc.date.available2025-07-23T06:38:32Z
dc.date.issued2025
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/106346
dc.description.abstractPT. Asia Raya Foundry is a manufacturing company engaged in metal casting, particularly in the production of screw press components. However, the production process has not been running efficiently due to issues in the facility layout and production flow, such as backtracking, by-passing, and excessively long distances between workstations. This study aims to design an improved facility layout and production flow that is more efficient, in order to reduce waste and increase productivity. The methods used in this study are Value Stream Mapping (VSM) to identify waste activities in the production flow, and a graph-based method utilizing the from-to chart to design a proposed layout based on the weight and frequency of material transfers between workstations. The analysis results indicate that Non-Value Added (NVA) activities are quite dominant, with a waiting time of 125.45 hours out of a total production time of 212.7 hours. The most significant waste occurred at the moulding and fettling stations, which were resolved through batch size adjustments and rescheduling. The proposed layout successfully reduced the total transfer moment from 49,784.69 m/month to 30,719.62 m/month. In addition, the Line Efficiency Rate (LER) increased significantly from 58.6% to 95.23%, indicating a substantial improvement in efficiency. Therefore, the proposed improvements in this study have successfully optimized the material flow and facility layout at PT. Asia Raya Foundry.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectFacility Layouten_US
dc.subjectProduction Flowen_US
dc.subjectValue Stream Mapping (VSM)en_US
dc.subjectGraphic Methoden_US
dc.subjectWasteen_US
dc.subjectProduct Efficiencyen_US
dc.titleUsulan Perbaikan Tata Letak Fasilitas pada PT. Asia Raya Foundry Menggunakan Metode Value Stream Mapping dan Metode Grafiken_US
dc.title.alternativeProposed Facility Layout Improvements at PT. Asia Raya Foundry Using Value Stream Mapping and Graphic Methodsen_US
dc.typeThesisen_US
dc.identifier.nimNIM200403178
dc.identifier.nidnNIDN0008066208
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages150 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record