• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Efisiensi Biaya dan Waktu akibat Pergantian Material pada Proyek Revitalisasi Komplek Stadion Kebun Bunga (Multi Years) (Studi Kasus: Pergantian Bata Merah menjadi Bata Ringan pada Pekerjaan Dinding di Gedung Olahraga Indoor)

    Analysis of Cost and Time Efficiency due to Material Change in the Revitalization Project of the Kebun Bunga Stadium Complex (Multi Years) (Case Study: Conversion of Red Brick to Light Brick on Wall Work in Indoor Sports Building)

    Thumbnail
    View/Open
    Cover (3.205Mb)
    Fulltext (6.600Mb)
    Date
    2025
    Author
    Gaol, Gerhard Sahala Tua Lumban
    Advisor(s)
    Hasibuan, Gina Cynthia Raphita
    Metadata
    Show full item record
    Abstract
    ABSTRACT The need for infrastructure continues to increase along with population growth and economic development, where building construction is one example, ranging from simple residences to high-rise buildings. The building requires walls as the main structural element that limits the space, providing privacy, security, and protection from the elements. This automatically increases the need for wall materials such as bricks. The rise of development has caused the availability and production of bricks to be crucial to meet the growing market demand. Over time, the materials in wall work continue to give rise to a diversity of types with their own disadvantages and advantages, in terms of cost and time of work, for example such as red bricks and light bricks. This study aims to analyze the difference in construction cost and time caused by the change of wall material from red brick to light brick in the revitalization project of the Kebun Bunga Stadium Complex. The quantitative method of construction is used as a reference, by comparing the total cost and completion time of each material. The results of the analysis from the management of the cost budget, unit price of work and bill of quantities show that the use of red bricks results in a total cost of IDR. 191.639.270,53 with a duration of 70 days. Meanwhile, the use of light bricks resulted in a cost of IDR. 170.985.141,283 but with a settlement time of only 26 days. Where the cost of using light bricks is cheaper around 10,7%, significant time efficiency reaches 62,852%. A comprehensive evaluation shows that replacing materials with lightweight bricks provides both cost and time benefits that have the potential to increase productivity and accelerate the implementation of construction projects.
    URI
    https://repositori.usu.ac.id/handle/123456789/106779
    Collections
    • Undergraduate Theses [1591]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV