Show simple item record

dc.contributor.advisorAnas, M.Ridwan
dc.contributor.advisorMulia, Ahmad Perwira
dc.contributor.authorPurba, Yosua
dc.date.accessioned2025-07-24T04:44:07Z
dc.date.available2025-07-24T04:44:07Z
dc.date.issued2025
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/106989
dc.description.abstractMedan City is one of the metropolitan cities that has a high level of crowd and population density and has many problems, one of which is a poor transportation system that results in congestion, delays, and air and noise pollution. This study aims to determine the simulation of intersection performance on S.M Raja – Halat road, Brigjend Katamso - Mesjid Raya road and Brigjend Katamso – Pelangi road before and after the operation of the underpass at the intersection Ir.H.Juanda - Brigjend Katamso road using vissim software and data obtained from traffic surveys such as vehicle volume surveys, road geometrics, Signalized cycle times and vehicle speeds. Furthermore, the data obtained from the results of the vissim software simulation are queue length, delay, and level of service. For the results of simulation data at the Ir.H.Juanda - Brigjend Katamso road intersection before the operation of the underpass (Do Nothing), where the average queue length is 274.43 m, the average delay is 307.38 sec/veh, So that the average level of service of the intersection is obtained in the form of F (Very Bad). at the intersection .Ir.H.Juanda - Brigjend Katamso road after the operation of the underpass (Do Something), where the average queue length is 0.00 m, the average delay is 0.00 sec/veh, So that the average intersection service level is obtained in the form of A (Very Good). at the intersection Ir.H.Juanda - Brigjend Katamso road after the operation of the underpass with the next 5 years scenario, where the average queue length is 19.53 m, the average delay is 10.34 sec/veh, So that the average intersection service level is obtained in the form of B (Good). So it is clear that there are significant differences between before and after the operation of the underpass such as the results of queue length, delay and level of service which cause new conflicts at the intersections of S.M Raja - Jl.Halat road, Brigjend Katamso - Mesjid Raya road, and Brigjend Katamso – Pelangi road.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectIntersection Performanceen_US
dc.subjectSimulationen_US
dc.subjectSignalizeden_US
dc.subjectUnderpassen_US
dc.subjectVissimen_US
dc.titleAnalisis Dampak Pembangunan Underpass Jalan Ir.H.Juanda – Jalan Brigjend Katamso Terhadap Simpang APILL Terdekat Menggunakan Software Vissimen_US
dc.title.alternativeTraffic Impact Analysis of the Ir.H.Juanda – Brigjend Katamso Intersection Underpass on the Nearest Signalized Intersection Using Vissim Softwareen_US
dc.typeThesisen_US
dc.identifier.nimNIM227016034
dc.identifier.nidnNIDN0005087605
dc.identifier.nidnNIDN0017046604
dc.identifier.kodeprodiKODEPRODI22101#Teknik Sipil
dc.description.pages210 Pagesen_US
dc.description.typeTesis Magisteren_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record