• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Usulan Perbaikan Tata Letak Fasilitas Produksi di PT Bukit Intan Abadi (BIA) Menggunakan Metode Systematic Layout Planning (SLP) dan Algoritma Blocplan

    Proposal for Improving the Layout of Production Facilities at PT Bukit Intan Abadi (BIA) Using the Systematic Layout Planning (SLP) Method and the Blocplan Algorithm

    Thumbnail
    View/Open
    Cover (6.934Mb)
    Fulltext (4.029Mb)
    Date
    2025
    Author
    Harahap, Rizki Al Rafi
    Advisor(s)
    Tarigan, Ukurta
    Metadata
    Show full item record
    Abstract
    The industrial revolution 4.0, you must be familiar with various production businesses, both small, medium, and large. To achieve the success of the production business, it must also be accompanied by the initial vision and mission to be achieved, so it is necessary to plan and design that must be prepared so that later it will be able to achieve the best production goals. Factors that affect the goal of production success are not only about investment, capital, suppliers, machines, skills, and distributors but also one of the things that must be observed is the planning of the layout and placement of factory facilities. PT. Bukit Intan Abadi (BIA) is a wood processing company of FJLB (Finger Joint Laminating Board). Problems that occurred during the research were delays in fulfilling orders, the distance of the position of the Sawmil station to Vaccum as far as 33.25m, Cross Movement from Sanding Costa station to the Material Warehouse passed by the sawmill to the vaccum and Bottleneck the Vaccum to KD and the flow efficiency value on the actual layout of the LER calculation is 74%. This study aims to evaluate the actual production floor layout, minimize the total displacement distance, and provide layout proposals using the Systematic Layout Planning (SLP) method and the Blocplan Algorithm. After the layout design was carried out, 2 alternatives were obtained in each design, then compared the two Systematic Layout Planning (SLP) methods and the Blocplan Algorithm. Based on the results of the layout research, the proposal was selected using the alternative Systematic Layout Planning (SLP) 2 method with a minimum total displacement of 555.13 m and a LER of 80%.
    URI
    https://repositori.usu.ac.id/handle/123456789/107695
    Collections
    • Undergraduate Theses [1591]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV