Show simple item record

dc.contributor.advisorHasibuan, Gina Cynthia Raphita
dc.contributor.advisorAnas, M Ridwan
dc.contributor.authorFitrah, Nabila
dc.date.accessioned2025-07-31T03:16:01Z
dc.date.available2025-07-31T03:16:01Z
dc.date.issued2025
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/107921
dc.description.abstractThe success of construction projectsi is highly influenced by the effectiveness of communication management among stakeholders. This study aims to analyze the impact of communication managementi on project success from the perspective of multiple stakeholders namely the owner, contractor, and consultant based on the case of Suspension Bridge construction in North Sumatra Province. A quantitative approach was used, applying Partial Least Squaresi Structural Equation Modeling (PLS-SEM) through SmartPLS v4.1.0.9 software. A total of 114 structured questionnairesi were distributed and analyzed. The findings show that communication management significantly affects project success, measured through three key indicators: cost, quality, and time. Among ten communication factors studied, communication ability, use of facilities and technology, and communication frequency are the most dominant. The influence of each stakeholder varies: the owner contributes most to cost efficiency, the contractor to time performance, and the consultant to project quality. Q² values for all models are above 0.45, indicating good predictive relevance, while Goodness of Fit (GoF) values confirm a strong model fit. These results emphasize the importance of structured, transparent, and technology-based communication management as a strategic approach to achieving project success in the construction sector.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectCommunication managementen_US
dc.subjectproject successen_US
dc.subjectstakeholderen_US
dc.subjectPLS-SEMen_US
dc.subjectSuspension bridge constructionen_US
dc.titleAnalisis Pengaruh Manajemen Komunikasi Terhadap Keberhasilan Proyek Menurut Perspektif Multiple Stakeholderen_US
dc.title.alternativeAnalysis Of The Influence Of Communication Management On Project Success According To The Multiple Stakeholder Perspective A Case Study: Construction Of Suspension Bridges In North Sumatraen_US
dc.typeThesisen_US
dc.identifier.nimNIM227016011
dc.identifier.nidnNIDN0010108906
dc.identifier.nidnNIDN0005087605
dc.identifier.kodeprodiKODEPRODI22101#Teknik Sipil
dc.description.pages112 Pagesen_US
dc.description.typeTesis Magisteren_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record