• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Pembuatan Furfural dari Cangkang Kemiri Menggunakan Proses Suprayield dengan Kapasitas 330 Ton/Tahun

    Preliminary Design of a Furfural Production Plant from Candlenut Shells Using the Suprayield Process with a Capacity of 330 Tons/Year

    Thumbnail
    View/Open
    Cover (1.455Mb)
    Fulltext (13.07Mb)
    Date
    2025
    Author
    Dolok Saribu, Indra Wahyu
    Nivasa, Kalvien
    Advisor(s)
    Husin, Amir
    Metadata
    Show full item record
    Abstract
    The preliminary design of a furfural production plant from candlenut shells using the SupraYield process has a production capacity of 330 tons/year with an operating time of 330 days/year. This preliminary design consists of three stages: raw material preparation, hydrolysis and dehydration, and purification. The hydrolysis and dehydration reactions are carried out using 4 fluidized bed reactor units operating at a temperature of 167°C with a residence time of 3.5 hours. The amount of raw material required to meet the plant's annual production capacity is 238.33 kg/hour. The furfural production plant is planned to be built in Deli Serdang Regency, North Sumatra Province, with a total plant area of 6,380 m². The water requirement for this plant will first be treated from the Buih River at 3,249.12 kg/hour. The planned organizational form of this furfural production plant is a Limited Liability Company (PT) with a line and staff organizational structure and a total of 100 employees. The results of the economic analysis carried out in this preliminary design are as follows: 1. Capital Investment (CI) = Rp106.416.844.358,37 2. Total Cost (TC) = Rp49.299.190.451,79 3. Profit Margin (PM) = 44,49% 4. Break Event Point (BEP) = 36,05% 5. Return On Investment (ROI) = 25,49% 6. Return On Network (RON) = 42,48% 7. Pay Out Time (POT) = 3,92 years 8. Internal Rate of Return (IRR) = 28,04% Based on the results of the analysis, it can be concluded that the furfural production plant from candlenut shells using the SupraYield process with a capacity of 330 tons/year is feasible to establish.
    URI
    https://repositori.usu.ac.id/handle/123456789/108408
    Collections
    • Undergraduate Theses [1205]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV