• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Pembuatan Katekin dari Gambir Melalui Ekstraksi Bertingkat dengan Pelarut Air dan Etil Asetat dengan Kapasitas Produksi 6000 Ton/Tahun

    Preliminary Design of a Catechin Production Plant from Gambir using Multistage Extraction with Water and Ethyl Acetate Solvents at a Capacity of 6,000 Tons per Year

    Thumbnail
    View/Open
    Cover (19.91Mb)
    Fulltext (25.37Mb)
    Date
    2025
    Author
    Nasution, Azzam Qisty
    Rifadillah, Rifadillah
    Advisor(s)
    Turmuzi, Muhammad
    Metadata
    Show full item record
    Abstract
    The production of catechin from gambier is carried out through an extraction process using water and ethyl acetate as solvents, under operating conditions of 70 °C and 1 atm pressure. The planned catechin plant is designed to operate with a production capacity of 6,000 tons per year, utilizing gambier as the raw material at a rate of 1,578 kg/hour and operating for 330 days annually. This plant is expected to optimize waste management and enhance Indonesia’s export commodities. The planned business entity for this project is a Limited Liability Company (PT). The organizational structure will follow a line-and-staff system, with a total workforce of 157 employees. The factory will be located in Tanjuang Balik Village, Pangkalan Koto Baru District, Lima Puluh Kota Regency, West Sumatra Province, on a land area of approximately 23,000 m². The results of the economic feasibility analysis for the Catechin Production Plant from Gambier are summarized as follows: Capital Investment (CI): Rp 3,008,389,114,081.54 Total Cost (TC): Rp 5,335,527,442,339.39 Sales Revenue: Rp 6,720,000,000,000.00 Net Profit: Rp 920,729,250,844.31 Profit Margin: 19.572 % Break-Even Point (BEP): 13.329 % Return on Investment (ROI): 30.60 % Pay-Out Time (POT): 3.267 years Internal Rate of Return (IRR): 31.815 % Based on the results of this economic analysis, it can be concluded that the Catechin Production Plant from Gambier with a Capacity of 6,000 Tons per Year is economically feasible to establish. Keywords: Catechin, Gambier, Ethyl Acetate, Extraction
    URI
    https://repositori.usu.ac.id/handle/123456789/109391
    Collections
    • Undergraduate Theses [1233]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV