Prarancangan Pabrik Pembuatan Katekin dari Gambir Melalui Ekstraksi Bertingkat dengan Pelarut Air dan Etil Asetat dengan Kapasitas Produksi 6000 Ton/Tahun
Preliminary Design of a Catechin Production Plant from Gambir using Multistage Extraction with Water and Ethyl Acetate Solvents at a Capacity of 6,000 Tons per Year

Date
2025Author
Nasution, Azzam Qisty
Rifadillah, Rifadillah
Advisor(s)
Turmuzi, Muhammad
Metadata
Show full item recordAbstract
The production of catechin from gambier is carried out through an extraction process using water and ethyl acetate as solvents, under operating conditions of 70 °C and 1 atm pressure. The planned catechin plant is designed to operate with a production capacity of 6,000 tons per year, utilizing gambier as the raw material at a rate of 1,578 kg/hour and operating for 330 days annually. This plant is expected to optimize waste management and enhance Indonesia’s export commodities.
The planned business entity for this project is a Limited Liability Company (PT). The organizational structure will follow a line-and-staff system, with a total workforce of 157 employees. The factory will be located in Tanjuang Balik Village, Pangkalan Koto Baru District, Lima Puluh Kota Regency, West Sumatra Province, on a land area of approximately 23,000 m².
The results of the economic feasibility analysis for the Catechin Production Plant from Gambier are summarized as follows:
Capital Investment (CI): Rp 3,008,389,114,081.54
Total Cost (TC): Rp 5,335,527,442,339.39
Sales Revenue: Rp 6,720,000,000,000.00
Net Profit: Rp 920,729,250,844.31
Profit Margin: 19.572 %
Break-Even Point (BEP): 13.329 %
Return on Investment (ROI): 30.60 %
Pay-Out Time (POT): 3.267 years
Internal Rate of Return (IRR): 31.815 %
Based on the results of this economic analysis, it can be concluded that the Catechin Production Plant from Gambier with a Capacity of 6,000 Tons per Year is economically feasible to establish.
Keywords: Catechin, Gambier, Ethyl Acetate, Extraction
Collections
- Undergraduate Theses [1233]