• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Disproportionated Rosin dari Getah Pinus Merkusii melalui Reaksi Dehidrogenasi dengan Katalis Paladium Karbon Kapasitas Produksi 2.500 Ton/Tahun

    Preliminary Design for the Production of Disproportionated Resin from Merkusii Pine Resin Using Dehydrogenation Reaction with Palladium Carbon Catalyst Capacity 2,500 Tons/Year

    Thumbnail
    View/Open
    Cover (6.406Mb)
    Fulltext (37.67Mb)
    Date
    2025
    Author
    Pakpahan, Christoper Carlo
    Banjarnahor, Ivan Mark Immanuel
    Advisor(s)
    Harahap, Hamidah
    Al Fath, Muhammad Thoriq
    Metadata
    Show full item record
    Abstract
    Disproportionated Rosin (DPR) is rosin that undergoes a catalytic reaction to remove conjugated double bonds, thus enhancing its stability. The primary goal of this factory design is to apply chemical engineering principles and provide initial information for designing a Disproportionated Rosin production plant. This pre-design for a Disproportionated Rosin plant utilizes Pinus merkusii gum through a dehydrogenation reaction with a palladium-carbon catalyst, with a production capacity of 2,500 tons per year. The main process in the pre-design consists of five stages: raw material preparation, raw material separation, reaction formation, product separation and purification, and raw material recycling. The plant is planned to be established in the Kendal Special Economic Zone, Kendal Regency, Central Java, covering an area of 6,900 m². A total of 195 workers will be required, and the business entity will be a Limited Liability Company (PT) managed by a director with a line-and-staff organizational structure. The required investment capital for the establishment and operation of the factory is IDR 298,872,825,337, with production costs amounting to IDR 254,749,017,737. Based on the feasibility analysis, the factory has a break-even point (BEP) of 40.78%, a return on investment (ROI) of 22.57%, a payback period (POT) of 4 years and 5 months, a return on net worth (RON) of 37.61%, and an internal rate of return (IRR) of 25.85%. From the economic analysis, it can be concluded that the pre-design for the Disproportionated Rosin plant from Pinus merkusii gum through the dehydrogenation reaction with a palladium-carbon catalyst is feasible for establishment.
    URI
    https://repositori.usu.ac.id/handle/123456789/109678
    Collections
    • Undergraduate Theses [1230]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV