• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Pembuatan Genteng Beton dengan Menggunakan Substitusi Fly Ash dengan Kapasitas 750.000 Lembar/Tahun

    Preliminary Design of Concrete Roof Tile Manufacturing Using Fly Ash Substitution with Capacity of 750,000 Sheets/Year

    Thumbnail
    View/Open
    Cover (10.88Mb)
    Fulltext (10.88Mb)
    Date
    2025
    Author
    Manurung, Rizky Sm.
    Hutabarat, Amirul Akbar
    Advisor(s)
    Harahap, Hamidah
    Metadata
    Show full item record
    Abstract
    Preliminary design of concrete roof tile manufacturing using fly ash substitution with a capacity of 750,000 sheets/year and operating for 338 days a year. The main process in this factory design consists of six stages, namely the raw material preparation stage, the mixing/hydration stage, the molding stage, the spraying/coating stage, the drying stage, and the packaging stage. In one day, the production of 2.219 sheets of concrete roof tiles is carried out. In this production, the raw materials used are sand, cement, fly ash, and water with a ratio of 3 Aggregate: 1 Matrix: 0.8 water cement factor. The concrete roof tiles produced have dimensions of 41.8 cm (p); 33 cm (l); 1.9 cm (t). The drying of the concrete roof tiles will take 8 hours with an air temperature of 50oC and RH 10%. The factory location is planned to be at Kawasan Industri Tuban (KIT), Karangdowo, Socorejo, Kecamatan Jenu, Kabupaten Tuban, East Java with a factory area of 6,442 m2. The factory will require 65 workers. The results of the economic analysis of this thesis are as follows: 1. Total Capital Investment (CI) = IDR 36,687,896,909.67 2. Total Cost (TC) = IDR 12,376,019,924.71 3. Total Sales = IDR 24,497.113.560.92 4. Net Profit = IDR 7,923,817,309.22 5. Profit Margin (PM) = 32.35% 6. Break Even Point (BEP) = 43.95% 7. Return on Investment (ROI) = 21.60% 8. Pay Out Time (POT) = 4.63 years 9. Return on Network (RON) = 36.00% 10. Internal Rate of Return (IRR) = 27.85% Based on the results of the economic analysis, it can be concluded that a concrete roof tile manufacturing factory is feasible to establish.
    URI
    https://repositori.usu.ac.id/handle/123456789/110282
    Collections
    • Undergraduate Theses [1237]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV