Perbaikan Aliran Proses Kerja PT Industri Pembungkus Internasional dengan Menggunakan Metode Maynard Operation Sequence Technique
| dc.contributor.advisor | Ishak, Aulia | |
| dc.contributor.author | Chandra, Charles | |
| dc.date.accessioned | 2025-11-20T06:02:30Z | |
| dc.date.available | 2025-11-20T06:02:30Z | |
| dc.date.issued | 2025 | |
| dc.identifier.uri | https://repositori.usu.ac.id/handle/123456789/110704 | |
| dc.description.abstract | Work design that involves waste will negatively impact the performance results. This waste can be identified using the Lean 3M method (Muda, Muri, Mura). Muda refers to waste, which is defined into seven types of waste, including overproduction, excessive processing, unnecessary transportation, excessive motion, inventory, waiting time, and defects. Muri refers to overload, which is the result of eliminating too much Muda from the process. An operator or machine is considered overloaded when used more than 100% to complete a task. Mura refers to imbalance, which can be found in fluctuations in customer demand and variations in cycle time for different operators. The unit of measurement used to assess performance is the standard time. Standard time is obtained by multiplying normal time by allowance. Normal time can be measured using the MOST method. The results of this study include the following time savings: 68.904 seconds (13.0435%) on the setup phase, 40.392 seconds (4.43864%) on “moving bundles to pallet” operation, 0 second (0%) on “cleaning slotter debris" operation, 118.8 seconds (21.3675%) on the inspection operation, and 45.144 seconds (45.7831%) on the feeder operation. | en_US |
| dc.language.iso | id | en_US |
| dc.publisher | Universitas Sumatera Utara | en_US |
| dc.subject | Work Design | en_US |
| dc.subject | Waste | en_US |
| dc.subject | Lean 3M | en_US |
| dc.subject | Muda | en_US |
| dc.subject | Muri | en_US |
| dc.subject | Mura | en_US |
| dc.subject | Time Savings | en_US |
| dc.subject | MOST Method | en_US |
| dc.subject | Standard Time | en_US |
| dc.title | Perbaikan Aliran Proses Kerja PT Industri Pembungkus Internasional dengan Menggunakan Metode Maynard Operation Sequence Technique | en_US |
| dc.title.alternative | Work Process Flow Improvement in PT Industri Pembungkus Internasional with Maynard Operation Sequence Technique Model | en_US |
| dc.type | Thesis | en_US |
| dc.identifier.nim | NIM190403109 | |
| dc.identifier.nidn | NIDN0020116702 | |
| dc.identifier.kodeprodi | KODEPRODI26201#Teknik Industri | |
| dc.description.pages | 114 Pages | en_US |
| dc.description.type | Skripsi Sarjana | en_US |
| dc.subject.sdgs | SDGs 9. Industry Innovation And Infrastructure | en_US |
Files in this item
This item appears in the following Collection(s)
-
Undergraduate Theses [1597]
Skripsi Sarjana
