Show simple item record

dc.contributor.advisorIshak, Aulia
dc.contributor.authorChandra, Charles
dc.date.accessioned2025-11-20T06:02:30Z
dc.date.available2025-11-20T06:02:30Z
dc.date.issued2025
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/110704
dc.description.abstractWork design that involves waste will negatively impact the performance results. This waste can be identified using the Lean 3M method (Muda, Muri, Mura). Muda refers to waste, which is defined into seven types of waste, including overproduction, excessive processing, unnecessary transportation, excessive motion, inventory, waiting time, and defects. Muri refers to overload, which is the result of eliminating too much Muda from the process. An operator or machine is considered overloaded when used more than 100% to complete a task. Mura refers to imbalance, which can be found in fluctuations in customer demand and variations in cycle time for different operators. The unit of measurement used to assess performance is the standard time. Standard time is obtained by multiplying normal time by allowance. Normal time can be measured using the MOST method. The results of this study include the following time savings: 68.904 seconds (13.0435%) on the setup phase, 40.392 seconds (4.43864%) on “moving bundles to pallet” operation, 0 second (0%) on “cleaning slotter debris" operation, 118.8 seconds (21.3675%) on the inspection operation, and 45.144 seconds (45.7831%) on the feeder operation.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectWork Designen_US
dc.subjectWasteen_US
dc.subjectLean 3Men_US
dc.subjectMudaen_US
dc.subjectMurien_US
dc.subjectMuraen_US
dc.subjectTime Savingsen_US
dc.subjectMOST Methoden_US
dc.subjectStandard Timeen_US
dc.titlePerbaikan Aliran Proses Kerja PT Industri Pembungkus Internasional dengan Menggunakan Metode Maynard Operation Sequence Techniqueen_US
dc.title.alternativeWork Process Flow Improvement in PT Industri Pembungkus Internasional with Maynard Operation Sequence Technique Modelen_US
dc.typeThesisen_US
dc.identifier.nimNIM190403109
dc.identifier.nidnNIDN0020116702
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages114 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record