• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Pembuatan Alfa-Terpineol dari Getah Pinus Melalui Proses Hidrasi Menggunakan Katalis Zeolit dengan Kapasitas 7.000 Ton/Tahun

    Pre-Design of A Plant For The Production of Alpha-Terpineol From Pine Sap Through A Hydrogenation Process Using Zeolite Catalysts With A Capacity Of 7,000 Tons/Year

    Thumbnail
    View/Open
    Cover (1.777Mb)
    Fulltext (13.75Mb)
    Date
    2025
    Author
    Putri, Irlya Ermayani
    Neha, Aldania Putri
    Advisor(s)
    Hanum, Farida
    Metadata
    Show full item record
    Abstract
    Alpha-Terpineol is a monoterpene alcohol compound derived from essential oils, mainly from turpentine (pine sap). Alpha-Terpineol is a chemical used as an ingredient in cosmetics, soaps, perfumes, and disinfectants, and is considered one of the most commonly used fragrances. The preliminary design of the Alfa-Terpineol manufacturing plant from pine sap is designed with a production capacity of 7,000 tons/year and operates 330 days a year. The production process involves three stages, namely: pretreatment stage, product formation stage, and product separation and storage stage. The factory is planned to be located on Jl. A. Yani, Toboyo, Tosari, Brangsong District, Kendal Regency, Central Java Province, with a land area of 14,404 m2. It will require 183 workers and will be organized as a limited liability company (PT) with a line and staff organizational structure. The economic evaluation shows a capital investment (CI) of Rp. 301.416.850.584, total production costs of Rp.150.740.543.906, sales profit of Rp. 263.992.048.311, and net profit of Rp. 83.919.364.764. This factory is projected to reach the break-even point (BEP) at 47,97% capacity with a return on investment (POT) of 3 years and 6 months. Based on the results of the economic analysis, the preliminary design of this factory is considered feasible to be established.
    URI
    https://repositori.usu.ac.id/handle/123456789/111408
    Collections
    • Undergraduate Theses [1261]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV