    Analisis Risiko Pelaksanaan Pekerjaan pada Tol Lingkar dengan Metode Fault Tree Analysis (FTA)

    Risk Analysis of Work Implementatiton on The Pekanbaru Ring Toll Road using The Fault Tree Analysis Method (FTA)

    Thumbnail
    View/Open
    Cover (8.266Mb)
    FullText (9.130Mb)
    Date
    2026
    Author
    Siregar, Grace Luisa
    Advisor(s)
    Syahrizal
    Metadata
    Show full item record
    Abstract
    The Pekanbaru Ring Road Toll Project, which is part of the Trans-Sumatra Toll Road, plays an important role in supporting transportation connectivity in Pekanbaru City and its surrounding areas. During its implementation, this project is exposed to potential risks that may lead to delays, cost overruns, and reduced construction quality. Therefore, this study aims to identify and analyze the risks associated with the execution of the works in this project using the Fault Tree Analysis (FTA) method. The research was conducted by distributing questionnaires to 9 respondents who are involved in the project. Risks were assessed based on the likelihood and consequence levels in accordance with AS/NZS 4360:2004 standards. Furthermore, to determine the root causes of the highest work-related risks, the Fault Tree Analysis (FTA) method was applied as a top-down approach to trace the Top Event to its Basic Events. The results of the study indicate that the risks originate from four main factors, namely management, technical, natural, and human factors. Based on the risk level calculations, five risks fall into the high-risk category, seven risks into the medium category, and nine risks into the low category. Management factors are found to be the most influential in the emergence of risks in the project. Suggested mitigation efforts include improving team coordination effectiveness, enhancing project planning and control, optimizing equipment maintenance, strictly implementing OHS, and anticipating weather changes in the field. By implementing these detailed risk management measures, it is expected that future similar projects can be carried out more smoothly, on schedule, and with minimized potential losses.
    URI
    https://repositori.usu.ac.id/handle/123456789/111967
    Collections
    • Undergraduate Theses [1625]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV