Browsing Undergraduate Theses by Issue Date
Now showing items 1-20 of 1625
-
Perencanaan Struktur Dinding Penahan Tanah Tipe Kantilever dengan Perkuatan Boredpile Diameter 60 Cm sebagai Alternatif untuk Menanggulangi Longsor dengan Menggunakan Program Plaxis 2d (Studi Kasus: Perkebunan Nusantara, Sumatera Utara)
(Universitas Sumatera Utara, 2026)Landslides are one of the most frequent geotechnical disasters in Indonesia, often causing significant losses in terms of infrastructure and economy. They are triggered by various factors such as geological conditions, ... -
Perencanaan Dinding Penahan Tanah Tipe Kantilever Alternatif 1 Tinggi 4 Meter sebagai Penanggulangan Kelongsoran dengan Metode Analitis dan Program Plaxis 2D (Studi Kasus: Perkebunan Nusantara, Sumatera Utara)
(Universitas Sumatera Utara, 2026)Landslides frequently occur in Indonesia due to various factors, including geological and topographical conditions, high rainfall, volcanic activity, and soil types prone to failure. Landslides can damage infrastructure ... -
Pengaruh Faktor Motivasi Kerja terhadap Kinerja Tukang pada Proyek Revitalisasi Lapangan Merdeka Medan (Multi Years)
(Universitas Sumatera Utara, 2026)The Merdeka Square Revitalization Project is a development project for open spaces and MSME buildings with large capacity. The construction project heavily depends on human resources, especially skilled laborers as on-site ... -
Analisis Risiko Aktivitas Proyek Drainase di Kota Medan Menggunakan Metode HIRARC
(Universitas Sumatera Utara, 2026)Drainage construction projects in urban areas such as Medan City are highly complex, as they not only concern occupational safety but also have direct impacts on the surrounding community and infrastructure. This study ... -
Analisis Risiko Pelaksanaan Pekerjaan pada Tol Lingkar dengan Metode Fault Tree Analysis (FTA)
(Universitas Sumatera Utara, 2026)The Pekanbaru Ring Road Toll Project, which is part of the Trans-Sumatra Toll Road, plays an important role in supporting transportation connectivity in Pekanbaru City and its surrounding areas. During its implementation, ... -
Penerapan Metode Line of Balance pada Proyek Pembangunan Gedung Bertingkat
(Universitas Sumatera Utara, 2026)Construction projects with repetitive activities, such as the construction of multi-storey buildings, require a scheduling method that can clearly and systematically describe the sequence of work. This study analyzes the ... -
Optimalisasi Waktu dan Biaya dengan Menggunakan Metode Time Cost Trade Off (Tcto) (Studi Kasus: Proyek Pembangunan Plat Lantai 2 Masjid Al Muwahhidin)
(Universitas Sumatera Utara, 2025)Success is a goal that must be achieved in a project. However, construction projects often face the challenge of delays in their implementation, which can potentially cause losses to all parties involved. Time Cost ... -
Kajian Hidrologi Dan Potensi Dekarbonisasi Pada Pembangkit Listrik Tenaga Air Run Off River Batang Toru Kabupaten Tapanuli Selatan
(Universitas Sumatera Utara, 2025)Indonesia has abundant water resource potential for the utilization of Hydroelectric Power Plant (HEPP). The Batang Toru River has a hydropower potential of 510 MW, which has not yet been maximized. The research problem ... -
Analisis Pengaruh Kolam Retensi dalam Mengurangi Debit Puncak Banjir di Kolam Laguna
(Universitas Sumatera Utara, 2025)The Impact of Retention Pond Construction on Reducing Peak Flood Discharge in Laguna Pond. This study aims to determine the impact of retention pond construction on reducing peak flood discharge in Laguna Pond. It ... -
Studi Perbandingan Penggunaan Rafter Honeycomb Beam terhadap Tapered Beam sebagai Benchmark Proyek Packaging Building - KEK Sei Mangkei
(Universitas Sumatera Utara, 2025)Long-span buildings in the industrial sector, such as factories, warehouses, and aircraft hangars, are generally built using a gable frame structure, as is the case in the packaging building project in this study. This is ... -
Analisis Momen, Shear, Defleksi, dan Tulangan Secant Pile dengan Numerikal dan Pemodelan pada Midas Gts Nx (Studi Kasus Underpass H.M Yamin)
(Universitas Sumatera Utara, 2025)Along with the times, infrastructure development in Medan City continues to progress. One of the strategic projects currently underway is the construction of an underpass on Jalan H.M. Yamin - Simpang Jalan Jawa, Medan ... -
Evaluasi Efektivitas Pembaharuan Sistem Saluran Drainase Terhadap Tinggi Muka Banjir di Kelurahan Martubung
(Universitas Sumatera Utara, 2025)Floods are water that overflows due to high rainfall. One way to overcome floods is to build good drainage channels. However, drainage often experiences sedimentation problems, garbage accumulates so that drainage ... -
Analisis Kapasitas Fatik Jembatan Komposit Standar Bina Marga dengan Metode Crack Propagation Analysis
(Universitas Sumatera Utara, 2025)Throughout its service life, bridge structures are subjected to cyclic loading due to vehicular traffic. This cyclic loading can lead to fatigue failure even when the applied stresses remain below the material's yield ... -
Estimasi Kapasitas Fatik Struktur Jembatan Baja Standar Bina Marga Terhadap Umur Layan
(Universitas Sumatera Utara, 2025)Bridges are one of the most important infrastructures that support national social and economic activities. Increased socio-economic activities lead to an increase in the number of road users, which results in dynamic loads ... -
Pemodelan Gelombang Yang Dibangkitkan Oleh Angin Untuk Lokasi Pantai Cermin Di Kecamatan Pantai Cermin Kabupaten Serdang Bedagai
(Universitas Sumatera Utara, 2025)Wind waves are generally considered to be surface gravity waves caused by wind and propagating under the restoring force of gravity. These waves have maximum particle motion right at the air-sea interface, the particle ... -
Model Estimasi Biaya Konseptual Konstruksi Bangunan Gedung dengan Menggunakan Metode Parametrik (Studi Kasus: Bangunan di Kota Medan dan Sekitarnya)
(Universitas Sumatera Utara, 2025)A building is a structure that is built permanently and it’s function is to accommodate the human activities. Building construction begins with initiation stage, in the form of a conception stage based on owner’s projections ... -
Evaluasi Seismik Bangunan Eksisting Berdasarkan ASCE 41-17 (Studi Kasus Menara Stadion Teladan)
(Universitas Sumatera Utara, 2025)Indonesia is located at the confluence of four tectonic plates and vulnerable to seismic hazards. This may result in structural failures by improper planning, use an old seismic design code, or the absence of seismic ... -
Analisis Daya Dukung dan Penurunan Bored Pile (Diameter 1,2) dengan Metode Analitis dan Metode Elemen Hingga (Studi Kasus Pembangunan Jalur Kereta Api Medan-Binjai BH-49)
(Universitas Sumatera Utara, 2025)In the construction of the Medan-Binjai railway, the construction consists of the upper structure and lower structure. In this project work, a type of deep foundation is used, namely bored pile. This study aims to find the ... -
Analisa Produktivitas Pekerja Konstruksi Dengan Metode Time Study (Studi Kasus: Proyek Pembangunan Rumah Sakit Murni Teguh Susanna Wesley)
(Universitas Sumatera Utara, 2025)Worker productivity is a critical factor in ensuring the successful implementation of a construction project schedule, as it directly impacts the alignment between the planned construction timeline and actual field progress. ... -
Kajian Risiko Banjir Kawasan Kota Medan Bagian Barat Berbasis Sistem Informasi Geografis
(Universitas Sumatera Utara, 2025)The West Medan City area, which includes three sub-districts, is one of the areas in Medan City that often floods. The cause of flooding is often due to the high intensity of rainfall. In reducing the impact of floods, ...
