Undergraduate Theses
Undergraduate Theses
Recently added
Now showing items 141-160 of 1609
-
Evaluasi Efektivitas Pembaharuan Sistem Saluran Drainase Terhadap Tinggi Muka Banjir di Kelurahan Martubung
(Universitas Sumatera Utara, 2025)Floods are water that overflows due to high rainfall. One way to overcome floods is to build good drainage channels. However, drainage often experiences sedimentation problems, garbage accumulates so that drainage ... -
Analisis Daya Dukung dan Penurunan Pondasi Bored Pile (Diameter 1,2 Meter) dengan Menggunakan Metode Analitis dan Metode Elemen Hingga (Studi Kasus Pembangunan Jalur Kereta Api Medan-Binjai Bh-48)
(Universitas Sumatera Utara, 2024)Congestion is one of the problems that we often encounter in traffic in Indonesia, especially on the Medan to Binjai route. This congestion occurs due to the heavy traffic flow caused by the large number of vehicles and ... -
Analisis Daya Dukung & Penurunan Pondasi Bored Pile (Diameter 0,5 Meter) dengan Metode Analitis dan Metode Elemen Hingga Menggunakan Data Sondir & PDA Test
(Universitas Sumatera Utara, 2024)In the construction of Menara Loncat Indah Kolam Renang Selayang, Medan, the existing construction consists of the upper structure and the lower structure. In this project work, a type of deep foundation of bored pile type ... -
Analisis Daya Dukung dan Penurunan Pondasi Bored Pile Berdiameter 0,5 Meter dengan Metode Analitis dan Metode Elemen Hingga
(Universitas Sumatera Utara, 2024)In the construction process of the CWS Pier at Tanjung Priuk Port using a bored pile foundation. The purpose of this research is to analytically find the axial bearing capacity of the bored pile foundation. The methods ... -
Analisis Faktor-Faktor Penghambat yang Berpengaruh terhadap Waktu Proyek
(Universitas Sumatera Utara, 2024)In the development of construction projects at the implementation stage, it is influenced by several factors that can hinder the performance of project time. Therefore, the delay problems contained in the project must be ... -
Analisis Momen, Shear, Defleksi, dan Tulangan Secant Pile dengan Numerikal dan Pemodelan pada Midas Gts Nx (Studi Kasus Underpass H.M Yamin)
(Universitas Sumatera Utara, 2025)Along with the times, infrastructure development in Medan City continues to progress. One of the strategic projects currently underway is the construction of an underpass on Jalan H.M. Yamin - Simpang Jalan Jawa, Medan ... -
Analisis Perencanaan Struktur Baja Bangunan Industri 10 Lantai Menggunakan Sistem Baja Pemikul Momen dan Sistem Rangka Baja dengan Bresing Konsentris Biasa
(Universitas Sumatera Utara, 2024)Indonesia is located in an area with a high risk of earthquakes, which makes it necessary to plan buildings to withstand earthquake forces. Earthquake-resistant structures can be designed to remain elastic but will require ... -
Studi Perbandingan Penggunaan Rafter Honeycomb Beam terhadap Tapered Beam sebagai Benchmark Proyek Packaging Building - KEK Sei Mangkei
(Universitas Sumatera Utara, 2025)Long-span buildings in the industrial sector, such as factories, warehouses, and aircraft hangars, are generally built using a gable frame structure, as is the case in the packaging building project in this study. This is ... -
Analisis Hidrodinamika pada Oscillating Water Column (OWC) Tipe U dengan Menggunakan Pemodelan Waktu (Time Domain Modelling)
(Universitas Sumatera Utara, 2024)Currently, the main source of energy in Indonesia still relies on non-renewable energy sources derived from fossil fuels. Fossil-based energy sources pose a major problem because fossil fuels are non-renewable and their ... -
Analisis Manajemen Risiko pada Proyek Pembangunan Overpass Jl.Stasiun (Tahun Jamak) dengan Metode Bow Tie Analysis
(Universitas Sumatera Utara, 2024)Traffic made on Jalan Stasiun, Medan City, prompted the construction of an overpass as a solution. This construction project faces various risks that can affect time, cost and quality. This research aims to recognize ... -
Evaluasi Efektivitas Pembangunan Kolam Retensi di Kecamatan Medan Labuhan Sebagai Upaya Pengendalian Banjir
(Universitas Sumatera Utara, 2024)This study aims to evaluate the effectiveness of retention pond construction in Medan Labuhan District as a flood control effort. Based on observations and analysis, the primary causes of flooding in the area are limited ... -
Analisis Faktor-Faktor Motivasi Kerja para Tenaga Ahli pada Perusahaan Konsultan Konstruksi
(Universitas Sumatera Utara, 2024)Experts are one of the important aspects that need to be considered for the successful implementation of construction planning, construction consultants are often faced with constraints on the low productivity of human ... -
Analisis Pengaruh Kolam Retensi dalam Mengurangi Debit Puncak Banjir di Kolam Laguna
(Universitas Sumatera Utara, 2025)The Impact of Retention Pond Construction on Reducing Peak Flood Discharge in Laguna Pond. This study aims to determine the impact of retention pond construction on reducing peak flood discharge in Laguna Pond. It ... -
Kajian Hidrologi Dan Potensi Dekarbonisasi Pada Pembangkit Listrik Tenaga Air Run Off River Batang Toru Kabupaten Tapanuli Selatan
(Universitas Sumatera Utara, 2025)Indonesia has abundant water resource potential for the utilization of Hydroelectric Power Plant (HEPP). The Batang Toru River has a hydropower potential of 510 MW, which has not yet been maximized. The research problem ... -
Analisis Pengaruh Beban Gempa Terhadap Respon Struktur Tangki Silinder Kapasitas 2000 ton dengan Variasi Perbandingan Diameter dan Tinggi Tangki
(Universitas Sumatera Utara, 2024)Indonesia is an earthquake-prone region so earthquakes have a considerable influence in designing building structures in Indonesian territory. Steel plate oil tank is a structure whose role is increasingly used in fluid ... -
Optimalisasi Waktu dan Biaya dengan Menggunakan Metode Time Cost Trade Off (Tcto) (Studi Kasus: Proyek Pembangunan Plat Lantai 2 Masjid Al Muwahhidin)
(Universitas Sumatera Utara, 2025)Success is a goal that must be achieved in a project. However, construction projects often face the challenge of delays in their implementation, which can potentially cause losses to all parties involved. Time Cost ... -
Analisis Kebutuhan Luasan dan Kapasitas Volume Tampung Kolam Detensi sebagai Upaya Pengendalian Banjir di Kecamatan Medan Selayang
(Universitas Sumatera Utara, 2024)The significant growth in the population of Medan, over time resulted in a change in the city's land use which initially functioned as a water catchment area turned into a residential area with minimal infiltration. The ... -
Pengendalian Biaya dan Waktu Proyek dengan Metode Earned Value Analysis (EVA) Menggunakan Software Primavera P6
(Universitas Sumatera Utara, 2024)PT Tri Putra Yusindo is a service contractor in the field of construction in the Bulking Oil Shed project located at Jalan Pelabuhan 3, Belawan I, Medan Kota Belawan, Medan City, North Sumatra. Bulking Oil Shed construction ... -
Pengaruh Penggunaan Crumb Rubber dan Low Density Polyethylene (LDPE) terhadap Karakteristik Campuran Lapisan Asphalt Concrete Wearing Course (AC-WC)
(Universitas Sumatera Utara, 2024)Modified asphalt is an innovation in asphalt where additives are added to bitumen with the aim of improving asphalt quality and reducing the use of asphalt in flexible pavement construction. The addition of rubber or plastic ... -
Analisis Performa Struktur Bangunan Bertingkat terhadap Gaya Gempa dengan Metode Analisis Linier Riwayat Waktu dengan software Midas GEN (Studi Kasus: Hotel Sapadia Jl. Sisingamangaraja)
(Universitas Sumatera Utara, 2024)In 2023, the Sapadia Hotel building project which has been stopped for 7- 8 years will be continued. So that the Sapadia Hotel building must be re-analyzed to check whether there are changes in the quality of concrete, ...