Analisis Daya Dukung Ultimit dan Penurunan pada Compression Loading Test Bored Pile Tunggal Diameter 0,6 Meter dengan Metode Semi Empiris dan Pemodelan Metode Elemen Hingga (Study Kasus Medan Focal Point)
(Universitas Sumatera Utara, 2014)Loaded foundation will undergo deformation which brings about the lowering of the foundation. The lowering, which is not uniformed and beyond the permitted lowering, can have fatal result on building structure on it. The ... -
Studi Parametrik Kinerja Dinding Pengisi Bata Merah pada Struktur Beton Bertulang Akibat Beban Gempa
(Universitas Sumatera Utara, 2015)In general, the clay brick infill panels is only considered as a load channeled into the structure. So that it influences the strength and stiffness of the wall not considered in planning building construction. Usually, ... -
Analisis Daya Dukung Bored Pile Diameter Satu Meter dengan Menggunakan Uji Beban Statik dan Menggunakan Model Tanah Mohr Coulomb pada Proyek Paragon Square Tangerang, Banten
(Universitas Sumatera Utara, 2015)Bored pile foundation is one of the deep foundations which are used to transfer load from the upper structure to the layer of hard soil (reaching the itended carrying capacity) without being over-reduction. The amount ... -
Kajian Kriteria Penanganan Jalan Nasional Lintas Timur Provinsi Sumatera Utara
(2011)National roads are crucial to the economy and it spurs the economic development potential of the area contained in the spots of production centers in the province of North Sumatra. National highway East Lines is the busiest ... -
Efektifitas Elemen CSTAkibat Suatu Beban Terpusat pada Balok Tinggi
(Universitas Sumatera Utara, 2004)Balok tinggi (deep beam) adalah suatu balok yang diperuntukkan memikul beban yang besar, yang mana beban yang signidikan tersebut diteruskan ke tumpuan oleh suatu dorongan gaya tekan yang merupakan hasil gabungan dari beban ... -
Analisis Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Jembatan di Sumatera Utara dan Aceh
(Universitas Sumatera Utara, 2012)One of the problems in bridge construction project is the delay in the project implementation. All parties involved in the project, such as the owner and the contractor, actually do not want this to occur. The delay in the ... -
Prediksi Perilaku Kekuatan Tanah Over Consolidated dengan Model Elastoplastis
(Universitas Sumatera Utara, 2004)Pada umumnya tanah lempung mengalami sifat elastis, plastis dan elastoplastis, dikarenakan terjadi pembahan dari tekanan volume maupun tekanan geser yang akan mengakibatkan tanah mengalami penyusutan dan pengembangan. ... -
Program Komputasi Analisa Resiko Gempa pada Daerah Sumatera Utara
(Universitas Sumatera Utara, 2004)Program komputasi percepatan rambat gelombang gempa dikembangkan dengan menggunakan Microsoft Visual Basic 6.0 dalam studi ini. Percepatan gelombang gempa dihitung berdasarkan fungsi atenuasi gelombang di batuan dasar dan ... -
Kajian Komprehensif Daya Dukung Pondasi Tiang Berdasarkan Uji Pembebanan Tekanan di Sungai Percut
(Universitas Sumatera Utara, 2004)Dalam merencanakan konstruksi pondasi tiang pancang, penentuan daya dukung tiang pancang merupakan suatu permasalahan pokok. Penentuan daya dukung tiang pancang tersebut sewaktu perencanaan belum dianggap sempurna sehingga ... -
Analisis Faktor – Faktor Yang Mempengaruhi Waktu Penyelesaian Proyek Jaringan Transmisi pada Perusahaan Kontraktor Rekanan PT. PLN (Persero) Unit Induk Pembangunan Jaringan Sumatera I
(Universitas Sumatera Utara, 2014)One of the problems in construction project is the delay of the project completion. The delay of the project completion can be identified as the difference between the time of the implementation and the schedule which ... -
Kajian Eksperimental Perilaku Besi Angkur Sebagai Penghubung Tarik
(Universitas Sumatera Utara, 2015)One of the experiments can be done to find out the behavior of the properties of monolithic beams on other tensile materials through tensile experiment (pull out test). By conducting this experiment, reinforcing concrete ... -
Potensi Energi Pltm Sungai Cikidang di Kabupaten Lebak Provinsi Banten
(Universitas Sumatera Utara, 2012)ABSTRACT Cikidang river is located in Cisungsang Village, subdistrict of Cibeber, district of Lebak, Banten Province, is potential for minihydro power plant because of the water flow and water fall height have a potential. ... -
Studi Eksperimen dan Numerikal Kuat Lekat Tarik Tulangan Polos dengan Beton
(Universitas Sumatera Utara, 2012)ABSTRACT One of the experiments that can be done to find out the behavior of the nature of monolith beam toward the other pull-out materials is through pull out test. Through this experiment, concrete reinforcement which ... -
Analisis Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Jembatan di Sumatera Utara dan Aceh
(Universitas Sumatera Utara, 2012)One of the problems in bridge construction project is the delay in the project implementation. All parties involved in the project, such as the owner and the contractor, actually do not want this to occur. The delay in the ... -
Mikrozonasi Percepatan Gempa Sumatera Utara
(Universitas Sumatera Utara, 2004)Penelitin dalam tesis ini menghitung percepatan gempa di batuan dasar dan dipermukaan tanah untuk wilayah Sumatera Utara. Data - data yang digunakan sebagai input adalah data-data dari Badan Meteorologi dan Geofisika, ... -
Tinjauan Kontribusi Lembaran Carbon Fiber Strip di Pasang Vertikal terhadap Lentur dan Geser pada Balok Langsing
(Universitas Sumatera Utara, 2013)In the structural design of reinforced concrete, the assurance about the safety of the structure against collapse is need, because it may occur during the age of the building. One of the potential fatal collapses in ... -
Pengamatan Dinamika Zona Pantai Menggunakan Teknologi Uav dan Gis
(Universitas Sumatera Utara, 2021)Dinamika perubahan topografi di sepanjang garis pantai terjadi akibat berbagai hal seperti transportasi material, fenomena cuaca, serta banyaknya aktivitas manusia di dekat atau di sepanjang garis pantai. Untuk itu, sebagai ... -
Analisis Konsolidasi menggunakan Preloading dan Prefabricated Vertical Drain dengan Metode Perhitungan Analitis, Plaxis 2D dan 3D pada Proyek Reklamasi Belawan Phase I
(Universitas Sumatera Utara, 2020)Geotechnical problems are an important problem, one of the geotechnical problems is the reduction and bearing capacity of soil which is the foundation of the dock. Each dock is planned in such a way that it has a certain ... -
Prioritisasi Pengelolaan Das Deli Menggunakan Metode Ahpsyi dalam Format Gis
(Universitas Sumatera Utara, 2020)The management of watersheds has been a challenge because there is a vast area of watersheds with limited resources and funding. Therefore, to aid the regulators in making decisions regarding planning the management and ... -
Studi Prioritas Pembiayaan Pembangunan Infrastruktur dengan Skema KPBU Menggunakan AHP
(Universitas Sumatera Utara, 2020)Public Private Partnership (PPP) in Indonesia is a KPBU (Collaboration between the Government and Businesses) in providing infrastuctures for public utilities by referring to some specifications specified by the Minister/Heads ...