• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Master Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Master Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Evaluasi Produktivitas dengan Menggunakan Total Productivity Model di Instalasi Pengolahan Air (IPA) Deli Tua PDAM Tirtanadi Provinsi Sumatera Utara

    View/Open
    Fulltext (1.971Mb)
    Date
    2017
    Author
    Lubis, Qamaruddin
    Advisor(s)
    Napitupulu, Humala L.
    Nazaruddin
    Metadata
    Show full item record
    Abstract
    Instalasi Pengolahan Air (IPA) Deli Tua adalah salah satu IPA milik Perusahaan Daerah Air Minum (PDAM) Tirtanadi Provinsi Sumatera Utara yang memproduksi air minum untuk kebutuhan masyarakat. Untuk mengetahui kinerja perusahaan perlu dilakukan evaluasi produktivitas yaitu dengan cara melakukan pengukuran produktivitas. Pengukuran produktivitas dilakukan dengan periode pengukuran per tahun dimulai dari tahun 2012 sampai tahun 2016. Dari hasil pengukuran produktivitas dengan menggunakan Total Productivity Modeldengan sumber input biaya tenaga kerja, biaya material, biaya modal dan biaya energi diketahui bahwa terjadi kecenderungan penurunan produktivitas IPA Deli Tua. Penurunan produktivitas tertinggi terdapat pada periode tahun 2014 dengan penurunan sebesar 17,48%, sedangkan yang terendah terjadi pada periode tahun 2016, yaitu penurunan sebesar 1,36%. Dari identifikasi masalah menggunakan Fishbone diagram diketahui bahwa faktor penyebab utama turunnya produktivitas perusahaan disebabkan input material yaitu bahan kimia tawas dan input energi berupa pemakaian tenaga listrik yang besar.Tujuan penelitian ini adalah mengevaluasi produktivitas sehingga didapatkan sebuah rancangan perbaikan untuk peningkatan produktivitas IPA Deli Tua. Alternatif rancangan perbaikan produktivitas ada tiga. Pertama, mengganti tawas dengan PAC. Kedua memasang kapasitor bank. Ketiga, perubahan secara simultan dengan mengganti tawas menjadi PAC dan memasang kapasitor bank. Dari hasil percobaan bahan kimia tawas dan PAC yang dipilih berdasarkan kelayakan segi ekonomi dan kualitas (dengan melakukan analisis varianfaktorial), maka PAC dipilih sebagai pengganti tawas. Selanjutnya melalui pendekatan evaluasi PET (Productivity Evaluation Tree), maka dapat diketahui peningkatan produktivitas yang tertinggi adalah alternatif ke tiga, yaitu mengganti tawas dan memasangkapasitor bank, sehingga terjadi kenaikan produktivitas sebesar 9,84%. Untuk rencana perbaikan produktivitas IPA Deli Tua secara total disusun berdasarkan metode 5W + 1H.
     
    Water Treatment Plant (IPA) Deli Tua is one of the IPA belongs to the Regional Water Company (PDAM) Tirtanadi North Sumatra province which produces water for the needs of the community. To determine the performance of the company is necessary to evaluate the productivity that is by making measurements of productivity. Productivity measurement is done by measuring the period of a year starting from 2012 to 2016. From the measurement productivity by using a Total Productivity Model with the input source of labor costs, material costs, capital costs and energy costs in mind that there is a tendency decrease in productivity IPA Deli Tua. Decreased productivity is highest in the period of 2014 with a decrease of 17.48%, while the lowest occurred in the period of 2016, representing a reduction of 1.36%. From the identification of the problem using the fishbone diagram is known that the main causes of the decline in productivity caused material inputs, namely chemicals alum and energy inputs in the form of a large electric power consumption. The purpose of this study was to evaluate the productivity to obtain a design improvements to increase productivity IPA Deli Tua. Alternative design productivity improvements, there are three. First, replace alum with PAC. Both install capacitor banks. Third, changes simultaneously by replacing alum into the PAC and install capacitor banks. From the experimental results of the chemical alum and PAC were selected based on the merits in terms of economy and quality (either by aanalysis ofvariance), factorialthen the PAC is selected instead of alum. Furthermore, through the PET evaluation approach(ProductivityEvaluationTree),it can be seen that the highest increase in productivity is the third alternative, namely to replace alum and install capacitor banks, so there is an increase in productivity by 9.84%. IPA for productivity improvement plan Deli Tua totally prepared on the methods 5W + 1H.

    URI
    http://repositori.usu.ac.id/handle/123456789/20764
    Collections
    • Master Theses [185]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV