Show simple item record

dc.contributor.advisorHusin, Amir
dc.contributor.advisorFaisal, Muhammad
dc.contributor.authorHulu, Cathrine Angelina
dc.date.accessioned2020-02-24T02:56:46Z
dc.date.available2020-02-24T02:56:46Z
dc.date.issued2019
dc.identifier.urihttp://repositori.usu.ac.id/handle/123456789/24393
dc.description.abstractAir limbah merupakan sumber daya alam yang telah kehilangan fungsinya, yang keberadaannya mengganggu kenyamanan dan keindahan lingkungan. Dalam PERMEN LHK No. 6 Tahun 2016 tentang Baku Mutu Air Limbah disebutkan bahwa air limbah adalah sisa dari suatu usaha dan atau kegiatan yang berwujud cair. Dampak yang ditimbulkan dari air limbah yang dibuang langsung ke lingkungan adalah gangguan kesehatan, estetika dan kerusakan lingkungan itu sendiri. Untuk mencegah hal tersebut, perlu dibangun Instalasi Pengolahan Air Limbah untuk menurunkan kadar parameter pencemar sebelum air limbah dibuang ke lingkungan atau badan air. Lokasi perancangan IPAL (Instalasi Pengolahan Air Limbah) yang direncanakan adalah di Universitas Sumatera Utara. Debit air buangan yang dihasilkan adalah sebesar 40 m3/hari. Pengolahan air limbah yang direncanakan menggunakan sistem ABR (Anaerobic Baffled Reactor). Berdasarkan perhitungan, didapatkan dimensi bak perangkap lemak panjang 2,5 m, lebar 0,7 m, kedalaman Air 1,5 m, tinggi ruang bebas 0,4 m, volume efektif 3,32 m3, bak ekualisasi panjang 4,5 m, lebar 4,5 m, kedalaman 2 m, tinggi ruang bebas 0,4 m, volume 48,60 m3, bak pengendap awal panjang 2,5 m, lebar 3 m, kedalaman 1 m, tinggi ruang bebas 0,4, volume 18,00 m3, Anaerobic Baffled Reactor panjang 1,5 m, lebar 3 m, kedalaman 2 m, tinggi ruang bebas 0,4 m, volume 43,20 m3, bak pengendap akhir panjang 3,2 m, lebar 3 m, kedalaman 1 m, tinggi ruang bebas 0,4, volume 14,40 m3, bak desinfeksi panjang 1,6 m, lebar 1,6 m, kedalaman 1 m, tinggi ruang bebas 0,4 m, volume 3,58 m3.Total biaya perencanaan IPAL di Fakultas Teknik Universitas Sumatera Utara diperkirakan estimasi biaya setelah pembulatan berkisar Rp 441.615.346. Dari hasil analisis dengan mempertimbangkan jumlah jiwa terlayani, ketersediaan lahan kosong dan topografi wilayah, maka ditetapkan ada 11 titik peletakan bangunan Instalasi Pengolahan Air Limbah di Universitas Sumatera Utara.en_US
dc.description.abstractWaste water is the natural resources that have lost their function and its existence disturbs the comfort and beauty of the environment. In PERMEN LHK No. 6 Tahun 2016 about waste water quality standards, it’s stated that waste water is the remains of business or activity in liquid. The impact of waste water that discharge directly to environment are health problems, aesthetics and environmental damage. To prevent this problem, we need to build Waste Water Treatment Plant to reduce the level of pollutant parameters before the waste water discharged into the environment.Planned design location of Waste Water Treatment Plant (WWTP) is at University of Sumatera Utara. Discharge of waste water produced is 40 m3/day. This Waste Water Treatment Plant planned to use the Anaerobic Baffled Reactor system. Based on the calculation results, the dimensions of the oil trap, length 2,5 m, width 0,7 m, water height 1,5 m, freeboard 0,4 m, efective volume 3,32 m3 ; equalization tank, length 4,5 m, width 4,5 m, height 2 m, freeboard 0,4 m, efective volume 48,60 m3; primary sedimentation, length 2,5 m, width 3 m, height 1 m, freeboard 0,4 m, efective volume 18,00 m3; Anaerobic Baffled Reactor, length 1,5 m, width 3 m, height 2 m, freeboard 0,4 m, efective volume 43,20 m3; secondary sedimentation, length 3,2 m, width 3 m, height 1 m, freeboard 0,4 m, efective volume 14,40 m3; desinfection tank, length 1,6 m, width 1,6 m, height 1 m, freeboard 0,4 m, efective volume 3,58 m3. Total cost of Waste Water Treatment Plant design at Faculty of Engineering University of Sumatera Utara esimated around Rp 441.615.346. According to results of the analysis with consider the population and topography of region, then there are 11 laying points of Waste Water Treatment Plant in University of Sumatera Utara.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectAnaeroben_US
dc.subjectInstalasien_US
dc.subjectLimbah Cairen_US
dc.subjectPerancanganen_US
dc.titleStudi Perancangan Instalasi Pengolahan Air Limbah (IPAL) di Lingkungan Universitas Sumatera Utaraen_US
dc.typeThesisen_US
dc.identifier.nimNIM150407029
dc.description.pages111 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record