• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Master Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Master Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Penentuan Lama Waktu Istirahat Berdasarkan Beban Kerja dengan Menggunakan Pendekatan Fisiologis di PTPN III Mambang Muda

    View/Open
    Fulltext (3.704Mb)
    Date
    2013
    Author
    Tamba, Fatimah
    Advisor(s)
    Matondang, A Rahim
    Nazaruddin
    Metadata
    Show full item record
    Abstract
    Restoring energt needs to be paid attenlion because /atigue occurs during the working process. One of the factors which can restore energy is taking a rest. An worker with iuzavy work loacl has dillerett period and frequency of rest with a worker who has light work load. The objective of the research was to find out the length of rest bcsed on work load in each working unit such as sorti g. boiling, ciearing, pressing, and purifying. The observation was otu the diference in work ioaC, based on pulse and oxygen consumption. The result o1 the calculation on pulse and cardiovcscular load (0% CfL) showed that workers in the sorting unit had higher work load than those who worl:ed in other units at the work load pulse of 100.67 pulses/minute (100.67 > 100 pulses/minuie) and 094 CVL was 30.12% (30.12 > 30%o) which indicated that over work load could cause fatigue. Therefore, improvement was needed to solve this problem. Determining break time, based oit work load, is by physiological approach which slates that break time in each worh unit now is sfficient so that additiona! break time in the work system is not needed any more (fu : 0). The result of the reseoi'ch showed that workers in the sorting unit hod over work load which causedfatigue. It is recommen,led that improvement should be made by d.widing work elements, and then each work element should be divided. Job rototion is for six workers in order to reduce the workers' work load and their fatigue so that work eflectiveness can be maintained
    URI
    https://repositori.usu.ac.id/handle/123456789/60521
    Collections
    • Master Theses [185]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV