dc.description.abstract | One of important things in executing project construction is scheduling, which is
required in order to predict the total duration of the project should be
accomplished. The Critical Path Method is a vital tool for the planning and control
of complex projects. The successful implementation of Critical Path Method
requires the availability of a clear determined time duration for each activity.
However, in the real world there is always uncertainty about determined time
durations of activities in a fuzzy project network. Hence, a trapezoidal fuzzy
number is represented as time duration of each activity. In this paper a simple
method namely metric distance rank for fuzzy numbers to a critical path method
for fuzzy project network and also using centroid method. The comparison reveal
that the method proposed in this paper is more effective in determining the
activity criticalities and finding the critical path in a fuzzy project network. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | Fuzzy Critical Path Method | en_US |
dc.subject | Trapezoidal Fuzzy Number | en_US |
dc.subject | Defuzzification | en_US |
dc.subject | Metric Distance Rank | en_US |
dc.title | Optimalisasi Penjadwalan Proyek Menggunakan Fuzzy Critical Path Method (Fuzzy CPM) Berdasarkan Metric Distance Rank pada Bilangan Fuzzy | en_US |
dc.type | Thesis | en_US |
dc.identifier.nim | NIM100803078 | |
dc.identifier.nidn | NIDN0018036102 | |
dc.identifier.nidn | NIDN0007016104 | |
dc.identifier.kodeprodi | KODEPRODI44201#Matematika | |
dc.description.pages | 90 Halaman | en_US |
dc.description.type | Skripsi Sarjana | en_US |