Show simple item record

dc.contributor.advisorRosmaini, Elly
dc.contributor.advisorBangun, Pengarapen
dc.contributor.authorHarahap, Nella Sari
dc.date.accessioned2022-12-26T05:01:18Z
dc.date.available2022-12-26T05:01:18Z
dc.date.issued2015
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/77737
dc.description.abstractABSTRACT Inventory control of rubber raw material in PT. Asahan Crumb Rubber is planned with EOQ (Economic Order Quantity) method which the goal is to minimize total inventory cost and also can be fulfill demand from costumer rapidly. Inventory control also can keep the factory production continuity. Result of the research shows that the method that the factory used with purchase of the raw material, use of the raw material, ordering cost, holding cost and total of inventory cost is bigger than the EOQ (Economic Order Quantity) method. With the result is reorder point (ROP) is 353.368 kg, safety stock is 278.462 kg, total inventory cost is Rp 625.782.148,00. Proved that the optimal number of reservations to the method of EOQ (Economic Order Quantity) with inventory cost savings of Rp 344.199.416,00 of the company’s costs. Keyword: EOQ method of inventory control, rubber raw material, safety stocken_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectEOQ method of inventory controlen_US
dc.subjectrubber raw materialen_US
dc.subjectsafety stocken_US
dc.titleAnalisis Pengendalian Persediaan Bahan Baku Karet dengan Metode EOQ (Economic Order Quantity) (Studi Kasus: PT. Asahan Crumb Rubber)en_US
dc.identifier.nimNIM110803025
dc.identifier.nidnNIDN0020056004
dc.identifier.nidnNIDN0015085603
dc.identifier.kodeprodiKODEPRODI44201#Matematika
dc.description.pages46 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record