dc.description.abstractAbstrack Implementation of development project will run optimally when there is a good planning. Scheduling a project can be done by described the components of the activities to be carried out. Types of activites to be implemented arranged in the order of actiities that must be done first. In this paper, there are two method of scedhuling. Critical Path Method (CPM) and Project Evaluation Review Technique (PERT). Based on the calculations that have been done then obtained a critical path A1-B-C1-D1-E1-F1-G1-H1-I1-K1-L-N1- P-S1-T1-U1-V1-W with total time 84 days, while the PERT method with probability of success 97,95 % need 86 days.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.titleMetode Project Evaluation and Review Technique (PERT) dan Critical Path Method (CPM) dalam Optimalisasi Penjadwalan Proyeken_US
dc.identifier.nimNIM070803035
dc.identifier.nidnNIDN0003035305
dc.identifier.nidnNIDN0020056004
dc.identifier.kodeprodiKODEPRODI44201#Matematika
dc.description.pages47 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record