Show simple item record

dc.contributor.advisorDarnius, Open
dc.contributor.advisorSebayang, Djakaria
dc.contributor.authorButarbutar, Tohonan Kristina
dc.date.accessioned2023-01-03T01:29:24Z
dc.date.available2023-01-03T01:29:24Z
dc.date.issued2008
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/79777
dc.description.abstractPT. Toba Pulp Lestari is a company which works in manufacturing. This company produces the pulp by uncertain demands. PT. Toba Pulp Lestari wants to optimize the using of the resources. One of the helping tools that can be used to solving the problem is Linear Programming. Hope that this model can help, the company to optimize the resources especially in determining the total production, level stock, total the workers and the total of the necessary overtime. Based on the result of the research that have done before, the total production of pulp on March 2008 is 11.055 ton, ending inventory for 6.616 ton, total for nonshift workers is 322 person while for the shift worker is 81 person and the total cost on March is Rp.25.652.287.641,00en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.titleOptimasi Perencanaan Agregat Akibat Permintaan tidak tetap dengan Metode Linear Programming Pada PT.Toba Pulp Lestari, Tbken_US
dc.typeThesisen_US
dc.identifier.nimNIM040803032
dc.identifier.nidnNIDN0014106403
dc.identifier.nidnNIDN0027125103
dc.identifier.kodeprodiKODEPRODI44201#Matematika
dc.description.pages80 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record