Show simple item record

dc.contributor.advisorTarigan, Johannes
dc.contributor.authorSteven, Steven
dc.date.accessioned2023-01-25T03:16:50Z
dc.date.available2023-01-25T03:16:50Z
dc.date.issued2022
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/80903
dc.description.abstractHuman resources are one of the factors that greatly influence the success of a project. No matter how small a job is, if it is not supported by adequate human resources in terms of quality and effectiveness, the results of the work will not be as maximal as expected. In carrying out construction, contractors often have productivity problems in construction projects. The purpose of this study was to analyze the influence of labor productivity on masonry work in the BCA Bukit Barisan Project and the PT. Waruna Project. From the research results, it was found that the average productivity of red brick masonry was 10.5m2/day for the BCA project and 12.8 m2/day for the PT. Waruna project. For the results of data analysis from the questionnaire, the variables determined simultaneously have a significant influence on productivity with the dominating factor in the BCA project being the Man Group Factor and the Supervision Group Factor in the PT. Waruna project. From the results of the F test, it is known that all independent variables, namely the human factor, time factor, material factor, control factor, and safety factor simultaneously have a significant effect on the productivity of the masonry workforce. Meanwhile, from the results of the t test, it is known that all independent variables have a partial effect on productivity. The most dominant factors are human factors and supervision, so it is necessary to formulate a strategy, namely the need for more supervision and communication between supervisors and workers for better project productivity so that projects can be completed more quicklyen_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectProductivityen_US
dc.subjectlaboren_US
dc.subjectmasonryen_US
dc.titleAnalisis Produktivitas Tenaga Kerja pada Pekerjaan Pemasangan Bata pada Bangunan Bertingkat di Kota Medan (Studi Kasus : Proyek Kpu Bca dan Pt.Waruna)en_US
dc.typeThesisen_US
dc.identifier.nimNIM170404095
dc.identifier.nidnNIDN0024125605
dc.identifier.kodeprodiKODEPRODI22201#Teknik Sipil
dc.description.pages70 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record