• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Pembuatan Isopropil Miristat dengan Teknologi Reactive Distillation untuk Reaksi Esterifikasi Isopropil Alkohol dan Asam Miristat dengan Kapasitas Produksi 30.000 Ton/Tahun dan Tugas Khusus Rancangan Keteknikan Flash Drum

    View/Open
    Fulltext (9.136Mb)
    Date
    2023
    Author
    Tampubolon, May Sarah
    Advisor(s)
    Sukeksi, Lilis
    Metadata
    Show full item record
    Abstract
    The design of the Isopropyl Myristate manufacturing plant using a Reactive Distillation (RD) reactor has a production capacity of 30,000 tons/year and operates for 330 days a year. The main process in this plant design consists of three stages, namely the reaction stage, the neutralization stage, and the purification stage. The reaction is an esterification reaction that takes place in the RD reactor column with an average temperature of 150°C with a retention time of 32 minutes in the reactor. The process in the production of IPM includes: 1. Preparation of Raw and Auxiliary Materials 2. Synthesis Stage (Reaction) 3. Neutralization Stage 4. Purification Stage The specific task that was completed was the technical design of the Flash Drum for the initial purification of IPM products. Flash Drum that has been designed has the following specifications: 1. Max steam speed : 0.0057 m/s 2. Minimum ship area : 0.078 m2 3. ID : 0.316m 4. OD : 0.322 m 5. Waiting time : 10 minutes 6. Ship height : 1,575 m 7. Ship volume : 0.131 m3 8. Thickness of vessel : 3/16 in 9. Number of flash drums : 1 unit The planned factory location is at Sei Mangkei Special Economic Zone (KEK) area, which is located in Simalungun Regency, more precisely in North Sumatra. The location of KEK Sei Mangkei with an area of 11,676 m2. The workforce needed is 250 people with the form of aPersereoan Terbatas (PT) business entity under the leadership of a General Manager. The results of the economic evaluation of the IPM Manufacture Factory from Myristic Acid and IPA are as follows: • Total Investment Capital : Rp. 2,002,862,934,077 • Total Production Cost : Rp. 1,523,715,554,998 • Sales Results : Rp. 2,060,163,600,000 • Net Profit : Rp. 536,448,045,002 • Profit Margin (PM) : 16.84% • Break Even Point (BEP) : 25.05% • Return on Investment (ROI) : 17.33% • Payment Period (POT) : 5.77 years • Network Return (RON) : 28.88% • Internal Rate of Return (IRR) : 16.30% From the results of the economic evaluation it can be interpreted that the IPM Manufacturing Plant from Myristic Acid and IPA is feasible to establish.
    URI
    https://repositori.usu.ac.id/handle/123456789/82173
    Collections
    • Undergraduate Theses [1201]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV